Davis-Bacon
IA20260015 (Rev 1)
Coverage: Iowa • Harrison.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| BRICKLAYER | $34.80 | $19.24 |
| CARPENTER | $33.42 | $18.66 |
| ELECTRICIANS | $27.29 | $11.07 |
| POWER EQUIPMENT OPERATORS: CLASS 3- BOBCAT/SKIDSTEER/SKID LOADER; LOADER (UNDER 35 H.P.); ROLLER | $32.62 | $21.94 |
| POWER EQUIPMENT OPERATORS: CLASS 2- BULLDOZER; GRADER/BLADE; LOADER 35 H.P. AND OVER); SCRAPER | $34.70 | $21.94 |
| POWER EQUIPMENT OPERATORS: CLASS 1- BACKHOE; EXCAVATOR | $35.02 | $21.94 |
| LABORER: PIPELAYER | $25.50 | $13.48 |
| LABORER: MASON TENDER - BRICK | $26.90 | $12.38 |
| LABORER: COMMON OR GENERAL | $25.50 | $13.48 |
| LABORER (MASON TENDER - CEMENT/CONCRETE) | $26.90 | $12.38 |
| CEMENT MASON/CONCRETE FINISHER | $33.01 | $17.30 |
| ROOFER (METAL ROOF ONLY) | $32.50 | $15.53 |
| ROOFER (EXCLUDING METAL ROOFS) | $32.50 | $15.53 |
| SHEET METAL WORKER | $15.04 | $3.82 |