Davis-Bacon
IA20260026 (Rev 1)
Coverage: Iowa • Dallas, Polk.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| BRICKLAYER | $37.44 | $19.12 |
| CARPENTER (DRYWALL HANGING ONLY) | $35.50 | $21.43 |
| ELECTRICIAN | $30.86 | $14.26 |
| POWER EQUIPMENT OPERATORS: CLASS 3- BOBCAT/SKIDSTEER/SKID LOADER; LOADER (UNDER 35 H.P.); ROLLER | $32.62 | $21.94 |
| POWER EQUIPMENT OPERATORS: CLASS 2- BULLDOZER; GRADER/BLADE; LOADER 35 H.P. AND OVER); SCRAPER | $34.70 | $21.94 |
| POWER EQUIPMENT OPERATORS: CLASS 1- BACKHOE; EXCAVATOR | $35.02 | $21.94 |
| LABORER: PIPELAYER | $29.36 | $17.99 |
| LABORER: MASON TENDER - BRICK | $29.36 | $17.99 |
| LABORER: COMMON OR GENERAL | $29.36 | $17.99 |
| LABORER (MASON TENDER - CEMENT/CONCRETE) | $29.36 | $17.99 |
| CEMENT MASON/CONCRETE FINISHER | $34.35 | $23.35 |
| SHEETMETAL WORKER | $15.04 | $3.82 |
| CARPENTER, EXCLUDES DRYWALL HANGING | $15.78 | $5.94 |