Davis-Bacon
IA20260076 (Rev 1)
Coverage: Iowa • Washington.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| BOILERMAKER | $48.48 | $33.91 |
| BRICKLAYER | $29.80 | $17.16 |
| FOR EMPLOYEES WITH LESS THAN 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY | $56.30 | $38.44 |
| POWER EQUIPMENT OPERATOR: (CLASS 3)- LOADER(UNDER 35 H.P.) WITH OR WITHOUT ATTACHMENTS, PAVER(ALL TYPES), ROLLER | $32.62 | $21.94 |
| POWER EQUIPMENT OPERATOR: (CLASS 2)- LOADER | $34.70 | $21.94 |
| POWER EQUIPMENT OPERATOR: (CLASS 1)- BACKHOE/EXCAVATOR/TRACKHOE | $35.02 | $21.94 |
| IRONWORKER: STRUCTURAL | $35.53 | $24.45 |
| IRONWORKER: ORNAMENTAL | $35.53 | $24.45 |
| IRONWORKER: REINFORCING | $37.50 | $30.99 |
| LABORER: PIPELAYER | $28.33 | $19.82 |
| PAINTER: BRUSH AND ROLLER | $29.55 | $12.10 |
| CEMENT MASON/CONCRETE FINISHER | $32.29 | $28.45 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT AND UNIT INSTALLATION) | $41.45 | $23.11 |
| ROOFER | $21.92 | $5.07 |
| PLUMBER | $29.11 | $11.55 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $30.25 | $11.88 |
| PAINTER: SPRAY | $19.76 | $9.05 |
| OPERATOR: FORKLIFT | $22.96 | $7.49 |
| OPERATOR: CRANE | $24.15 | $8.10 |
| OPERATOR: BULLDOZER | $26.13 | $13.56 |
| LABORER: MASON TENDER - BRICK | $19.39 | $8.17 |
| LABORER: COMMON OR GENERAL | $16.52 | $4.24 |
| INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $16.70 | $8.12 |
| ELECTRICIAN | $26.06 | $8.14 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $23.97 | $3.09 |
| BRICKLAYER | $24.90 | $9.60 |