Davis-Bacon
ID20260091 (Rev 0)
Coverage: Idaho • Bannock.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| POWER EQUIPMENT OPERATOR: Blade Operator, Backhoe/Trackhoe/Excavator (3/4 yds- 3 1/2 yds, Front End Loader (over 4 yds to and including 7yds) GROUP 6 | $36.98 | $16.10 |
| Bulldozer GROUP 8 | $37.58 | $16.10 |
| Elevating Grader Operator, Backhoe/Trackhoe/Excavator (under 3/4 yds) GROUP 5 | $36.81 | $16.10 |
| Front End Loader (up to 4yd) GROUP 4 | $36.64 | $16.10 |
| Grader (Fine), Front End Loader (over 7 yds), Heavy Duty Mechanic GROUP 7 | $37.35 | $16.10 |
| Roller GROUP 3 | $36.33 | $16.10 |
| LABORER: Pipelayer | $28.48 | $13.00 |
| CARPENTER (Form Work Only) | $26.24 | $9.48 |
| CARPENTER, Excludes Form Work | $23.92 | $9.84 |
| CEMENT MASON/CONCRETE FINISHER | $22.90 | $11.99 |
| ELECTRICIAN | $26.33 | $11.45 |
| HIGHWAY/PARKING LOT STRIPING: Painter | $25.47 | $9.52 |
| LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor | $19.38 | $7.63 |
| LABORER: Common or General | $19.18 | $7.65 |
| LABORER: Grade Checker | $20.64 | $7.37 |
| LABORER: Mason Tender - Cement/Concrete | $22.34 | $10.90 |
| OPERATOR: Bobcat/Skid Steer/Skid Loader | $21.15 | $8.20 |
| OPERATOR: Broom/Sweeper | $24.34 | $8.04 |
| OPERATOR: Crane | $23.34 | $9.45 |
| OPERATOR: Forklift | $23.13 | $9.17 |
| OPERATOR: Oiler | $22.25 | $6.52 |
| OPERATOR: Paver (Asphalt, Aggregate, and Concrete) | $24.37 | $7.11 |
| OPERATOR: Roller (Subgrade) | $19.99 | $7.99 |
| OPERATOR: Screed | $22.30 | $7.22 |
| TRAFFIC CONTROL: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper | $17.69 | $4.66 |
| TRUCK DRIVER: Dump Truck | $21.59 | $10.93 |
| TRUCK DRIVER: Lowboy Truck | $26.61 | $13.21 |
| TRUCK DRIVER: Oil Distributor Truck | $23.93 | $11.27 |
| TRUCK DRIVER: Water Truck | $21.54 | $12.19 |