Davis-Bacon
IL20260053 (Rev 1)
Coverage: Illinois • Boone.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| TILE SETTER | $45.49 | $25.72 |
| TERRAZZO WORKER/SETTER | $44.38 | $25.84 |
| CARPENTER (INCLUDING SOFT FLOOR LAYER AND BATT/BLOWN INSULATION) | $37.19 | $26.60 |
| ELECTRICIAN (BOONE COUNTY) | $30.61 | $28.17 |
| PER HOUR EXTRA | $51.60 | $51.05 |
| PER HOUR EXTRA | $53.60 | $51.05 |
| PER HOUR EXTRA | $56.05 | $51.05 |
| PER HOUR EXTRA | $56.75 | $51.05 |
| LABORER: COMMON, LANDSCAPE (BOONE COUNTY) | $42.72 | $28.19 |
| PAINTER: BRUSH, ROLLER, SPRAY, SANDBLASTING, PAPERHANGER, DRYWALL FINISHING, TAPER, AND SPRAY STRUCTURAL STEEL (BOONE, JO DAVIESS, LEE, OGLE, STEPHENSON AND WINNEBAGO COUNTIES) | $45.15 | $29.41 |
| PLASTERER (BOONE COUNTY) | $37.90 | $37.66 |
| CEMENT MASON/CONCRETE FINISHER (BOONE COUNTY) | $41.03 | $36.39 |
| PLUMBER | $55.54 | $31.43 |
| ROOFER | $50.25 | $30.43 |
| SHEET METAL WORKER (INCLUNDING HVAC) | $39.47 | $31.55 |
| LABORERS: PLANTSMAN | $9.00 | $0.00 |
| PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $48.93 | $26.70 |
| PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $48.82 | $26.70 |
| PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $48.62 | $26.70 |
| PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $48.47 | $26.70 |
Related Wage Determinations
View directory →Davis-Bacon
IL20260003 (Rev 1)
Illinois • Peoria, Tazewell
Davis-Bacon
IL20260005 (Rev 1)
Illinois • Macon
Davis-Bacon
IL20260006 (Rev 1)
Illinois • Kankakee
Davis-Bacon
IL20260010 (Rev 1)
Illinois • Winnebago
Davis-Bacon
IL20260007 (Rev 2)
Illinois • Madison, St Clair
Davis-Bacon
IL20260020 (Rev 1)
Illinois • Boone, Cook, De Kalb +16