Davis-Bacon
IN20260003 (Rev 2)
Coverage: Indiana • Clay, Gibson, Greene +9.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| L, SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (CLAY, GREENE, OWEN, PARKE, PUTNAM, VERMILLION AND VIGO COUNTIES) | $23.00 | $14.40 |
| ULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANCIAL SYSTEMS (CLAY, GREENE, OWEN, PARKE, PUTNAM, VERMILLION AND VIGO COUNTIES) | $40.20 | $25.68 |
| EMS. ALSO THE APPLICATION OF FIRESTOPPING MATERIAL OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS, CURTAIN WALLS AND ALL LEAD ABATEMENT (GIBSON, POSEY, SULLIVAN, VANDERBURGH AND WARRICK COUNTIES) | $38.19 | $23.59 |
| BOILERMAKER | $43.24 | $38.17 |
| MARBLE, TILE & TERRAZZO WORKERS (EVANSVILLE POSEY, VANDERBURGH AND WARRICK COUNTIES) | $28.49 | $16.46 |
| MARBLE, TILE & TERRAZZO FINISHER (EVANSVILLE POSEY, VANDERBURGH AND WARRICK COUNTIES) | $22.09 | $16.34 |
| BRICKLAYER, STONEMASON (EVANSVILLE POSEY, VANDERBURGH AND WARRICK COUNTIES) | $34.17 | $20.14 |
| TILE, MARBLE SETTER (BLOOMINGTON OWEN COUNTY) | $37.22 | $18.05 |
| TILE & MARBLE FINISHER (BLOOMINGTON OWEN COUNTY) | $25.33 | $14.19 |
| TERRAZZO WORKER/SETTER (BLOOMINGTON OWEN COUNTY) | $37.97 | $18.06 |
| TERRAZZO FINISHER (BLOOMINGTON OWEN COUNTY) | $25.33 | $14.19 |
| BRICKLAYER, STONEMASON (BLOOMINGTON OWEN COUNTY) | $35.21 | $18.19 |
| BRICKLAYER: TILE, MARBLE, MOSAIC (TERRE HAUTE CLAY, GIBSON, REENE, PARKE, SULLIVAN, VERMILLION AND VIGO COUNTIES) | $35.63 | $17.23 |
| BRICKLAYER: TERRAZZO FINISHER (TERRE HAUTE CLAY, GIBSON, REENE, PARKE, SULLIVAN, VERMILLION AND VIGO COUNTIES) | $23.38 | $1,315.00 |
| BRICKLAYER: TERRAZZO (TERRE HAUTE CLAY, GIBSON, REENE, PARKE, SULLIVAN, VERMILLION AND VIGO COUNTIES) | $27.50 | $15.20 |
| CARPENTERS: SOFT FLOOR LAYERS (CLAY, OWEN, PARKE, PUTNAM, VERMILLION AND VIGO COUNTIES) | $35.54 | $22.12 |
| CARPENTER: PILEDRIVER (POSEY, VANDERBURGH AND WARRICK COUNTIES) | $34.04 | $26.50 |
| CARPENTER: CARPENTER (POSEY, VANDERBURGH AND WARRICK COUNTIES) | $33.09 | $26.50 |
| CARPENTER: PILEDRIVER (GREENE, GIBSON AND SULLIVAN COUNTIES) | $34.08 | $26.46 |
| CARPENTER: CARPENTER (GREENE, GIBSON AND SULLIVAN COUNTIES) | $33.08 | $26.46 |
| MILLWRIGHT, ZONE 2 (GIBSON, GREENE AND SULLIVAN COUNTIES) | $35.00 | $29.33 |
| MILLWRIGHT, ZONE 1 (POSEY, VANDERBURGH AND WARRICK COUNTIES) | $36.30 | $28.37 |
| ELECTRICIAN (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) | $46.14 | $21.90 |
| ELECTRICIAN (PUTNAM COUNTY) | $45.45 | $28.19 |
| ELECTRICIAN (VERMILLION COUNTY) | $40.00 | $27.36 |
| ELECTRICIAN (CLAY, GREENE, OWEN, PARKE, SULLIVAN AND VIGO COUNTIES) | $43.30 | $25.32 |
| CTION AND REPRODUCTION APPARATUS, EQUIPMENT AND APPLIANCES USED FOR DOMESTIC, COMMERCIAL, EDUCATION, ENTERTAINMENT AND PRIVATE TELEPHONE SYSTEMS. (CLAY, GREENE, OWEN, PARKE, SULLIVAN AND VIGO COUNTIES) | $30.00 | $18.07 |
| ARS OF SERVICE. B) EIGHT PAID HOLIDAYS: THANKSGIVING DAY; NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY | $62.73 | $38.44 |
| FOR LESS THAN 5 YEARS' SERVICE | $60.17 | $38.44 |
| PILING HAMMER-HYDRAULIC HAMMER OR AUGER, WATER PUMP, WIDENER (APSCO OR SIMILAR TYPE) WELDING MACHINE, JLG LIFTS AND SCISSOR LIFTS OR SIMILAR MACHINE. (GIBSON, POSEY, VANDERBURGH, AND WARRICK COUNTIES) | $35.30 | $19.60 |
| NE (PIPELINE), TOWER CRANE, TRENCH MACHINE, WELDER (HEAVEY DUTY), TRUCK MOUNTED CONCRETE PUMP, TRUCK-MOUNTED DRILL, VACUUM TRUCK, WELL POINT WHIRLEYS. (GIBSON, POSEY, VANDERBURGH, AND WARRICK COUNTIES) | $43.43 | $19.60 |
| PER HOUR ABOVE THE REGULAR RATE | $26.75 | $23.00 |
| PER HOUR ABOVE THE REGULAR RATE | $33.90 | $23.00 |
| IRONWORKER (CLAY, DAVIESS, GREENE, KNOX, LAWRENCE, MARTIN, MONROE, MONTGOMERY, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION AND VIGO COUNTIES) | $38.00 | $26.39 |
| IRONWORKER (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) | $35.34 | $25.75 |
| CAISSON AND TUNNEL WORK IN COMPRESSED AND FREE AIR: GROUP 1: Cage Tenders, Dump Men, Flagman, Signalman, Top Laborers, Rod Men (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, VIGO COUNTIES) | $23.18 | $16.00 |
| r Car, Car Pushers, Concrete Laborers, Grout Laborers, Lock Tenders (free air side), Steel Setters, Tuggers, Tuggers, Switchmen. (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, VIGO COUNTIES) | $23.93 | $16.00 |
| aintenance Technician, Miner, Bricklayer Tenders, Concrete Blowers, Drillers, Erectors, Form Men, Jackhammermen, Mining Machine. (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, VIGO COUNTIES) | $24.18 | $16.00 |
| CAISSON AND TUNNEL WORK IN COMPRESSED AND FREE AIR: GROUP 4: Dynamite Men, Drillers air track or wagon drilling for explosives. (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, VIGO COUNTIES) | $24.18 | $16.00 |
| S-AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES LABORERS CLASSIFICATIONS FOR CAISSON AND TUNNEL WORK IN COMPRESSED AND FREE AIR (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, AND VIGO COUNTIES) | $30.43 | $18.55 |
| LABORERS; CEMENT GUN OPERATORS; SCAFFOLD BUILDERS WHEN WORKING FOR PLASTERERS AND FOR MASONS; WATER BLAST MACHINE OPERATORS. (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, AND VIGO COUNTIES) | $29.18 | $18.55 |
| HALT PAVER; CHAIN SAW AND DEMOLITION SAW OPERATORS; CONCRETE CONVEYOR ASSEMBLERS; ASBESTOS REMOVAL; HAZARDOUS WASTE REMOVAL. (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, AND VIGO COUNTIES) | $28.43 | $18.55 |
| LABORERS: GROUP 4 DYNAMITE MAN (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) | $33.97 | $19.20 |
| DER; MORTAR MIXER; WELDER (ACETYLENE OR ELECTRIC); CUTTING TORCH OR BURNER; CEMENT GUN OPERATOR; SCAFFOLD BUILDER (WHEN WORKING FOR PLASTERER OR MASON) (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) | $33.47 | $19.20 |
| HANDLER (BULK OR BAR); PNEUMATIC SPIKER; DECK/ENGINE/WINCH OPERATOR; WATER MAIN & CABLE DECKING (METALLIC OR NON-METALLIC); REMOTE CONTROLLED COMPACTOR (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) | $31.07 | $19.20 |
| WIREMESH; FIRE PREVENTION; FIRE WATCH; FIRE STOP TENDER (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) | $30.47 | $19.20 |
| HOUR ABOVE BASE WAGE | $32.12 | $21.20 |
| HOUR ABOVE BASE WAGE | $31.87 | $21.20 |
| HOUR ABOVE BASE WAGE | $31.12 | $21.20 |
| PREMIUM FOR WORK ON STRUCTURES OVER 100 FT ABOVE FLOOR/GROUND LEVEL | $32.20 | $15.55 |
| PREMIUM FOR WORK ON STRUCTURES OVER 100 FT ABOVE FLOOR/GROUND LEVEL | $34.20 | $15.55 |
| PREMIUM FOR WORK ON STRUCTURES OVER 100 FT ABOVE FLOOR/GROUND LEVEL | $33.20 | $15.55 |
| PREMIUM FOR WORK ON STRUCTURES OVER 100 FT ABOVE FLOOR/GROUND LEVEL | $31.20 | $15.55 |
| GLAZIER (GIBSON, POSEY, VANDERBURGH, WARRICK COUNTIES) | $35.13 | $19.57 |
| GLAZIER (CLAY; GREENE; OWEN; PARKE; PUTNAM; SULLIVAN; VERMILLION AND VIGO COUNTIES) | $36.03 | $20.55 |
| CEMENT MASON/CONCRETE FINISHER (CLAY, OWEN, PARKE, PUTNAM, VERMILLION AND VIGO COUNTIES:) | $25.75 | $13.50 |
| CEMENT MASON/CONCRETE FINISHER (GREENE AND SULLIVAN COUNTIES) | $28.50 | $13.50 |
| CEMENT MASON/CONCRETE FINISHER (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) | $26.30 | $16.91 |
| CLAY, GIBSON, GREENE, OWEN, PARKE, POSEY, PUTNAM, SULLIVAN, VANDERBURGH, VERMILLION, VIGO AND WARRICK COUNTIES) | $31.50 | $18.32 |
| PLUMBERS AND PIPEFITTERS (REMAINING COUNTIES) | $46.42 | $21.33 |
| PLUMBERS AND PIPEFITTERS (CLAY, GREENE, PARKE, PUTNAM (PART), SULLIVAN, VERMILLION AND VIGO COUNTIES) | $46.65 | $21.95 |
| PLUMBERS AND PIPEFITTERS (PUTNAM COUNTY (EAST OF ROAD 43 EXCEPT TERRITORY ON A EAST MILE RADIUS FROM THE COURT HOUSE)) | $50.05 | $20.39 |
| ROOFERS: SLATE & TILE (REMAINING COUNTIES) | $31.60 | $19.43 |
| ROOFERS: COMPOSITION (REMAINING COUNTIES) | $31.60 | $19.43 |
| ROOFERS: (PUTNAM COUNTY) | $32.00 | $16.61 |
| ROOFER (CLAY, GREENE, OWEN, PARKE, SULLIVAN, VERMILLION AND VIGO COUNTIES) | $30.00 | $18.30 |
| SPRINKLER FITTER | $44.20 | $27.88 |
| SHEET METAL WORKER HVAC DUCT WORK (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, AND VIGO COUNTIES) | $39.53 | $22.92 |
| SHEET METAL WORKER HVAC DUCT WORK (GIBSON, POSEY, VANDERBURGH, AND WARRICK COUNTIES) | $40.19 | $27.33 |
| PER DAY & 450.00 PER WEEK | $34.02 | $0.42 |
| PER DAY & 450.00 PER WEEK | $33.52 | $0.42 |
| PER DAY & 450.00 PER WEEK | $33.37 | $0.42 |
| PER DAY & 450.00 PER WEEK | $33.17 | $0.42 |
| PER DAY & 450.00 PER WEEK | $32.67 | $0.42 |
| OADED, SUCH AS KOEHRING OR SIMILAR DUMPSTERS, TRACK TRUCKS, EUCLID BOTTOM DUMP AND HUG BOTTOM DUMP, TOURNATRAILERS, TOURNAROCKERS OR SIMILAR EQUIPMENT. (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) | $27.76 | $21.52 |
| TRUCK DRIVERS: GROUP 2 TANDEM TRUCKS OR DUMP TRUCKS; FARM TRACTOR PULLING TRAILER; BITUMINOUS DISTRIBUTORS, PAVEMENT BREAKERS (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) | $27.54 | $21.52 |
| TRUCK DRIVERS: GROUP 1 PICKUP TRUCKS, WINCH TRUCKS, WAREHOUSEMAN, MECHANIC, STREET SWEEPERS, SINGLE AXLE TRUCKS (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) | $27.08 | $21.52 |
Related Wage Determinations
View directory →Davis-Bacon
IN20260007 (Rev 1)
Indiana • Jackson
Davis-Bacon
IN20260017 (Rev 1)
Indiana • Huntington
Davis-Bacon
IN20260023 (Rev 1)
Indiana • Decatur, Jefferson, Jennings +3
Davis-Bacon
IN20260042 (Rev 1)
Indiana • Delaware
Davis-Bacon
IN20260044 (Rev 1)
Indiana • Hamilton
Davis-Bacon
IN20260045 (Rev 1)
Indiana • Madison