Skip to content
Davis-Bacon

IN20260032 (Rev 2)

Coverage: Indiana • Jackson.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR$33.65$16.40
POWER EQUIPMENT OPERATOR: PAVER: ASPHALT, AGGREGATE, AND CONCRETE$33.65$16.40
POWER EQUIPMENT OPERATOR: (2) LOADER$38.60$28.83
LABORER: (2) MASON TENDER - CEMENT/CONCRETE$37.15$23.48
LABORER: (1) PIPELAYER$23.13$16.00
PLUMBER$34.01$14.00
ROOFER$43.00$21.41
SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION)$43.44$27.89
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$26.20$10.74
PAINTER: SPRAY$18.29$7.43
PAINTER: ROLLER$18.29$7.43
PAINTER: BRUSH ONLY$18.29$7.43
OPERATOR: BULLDOZER$27.35$13.44
LABORER: MASON TENDER - BRICK$14.00$0.00
LABORER: COMMON OR GENERAL$13.93$0.00
ELECTRICIAN$17.48$3.40
CEMENT MASON/CONCRETE FINISHER$17.78$0.00
CARPENTER$18.36$7.46

Related Wage Determinations

View directory →