Davis-Bacon
KS20260014 (Rev 1)
Coverage: Kansas • Franklin.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| CARPENTER | $43.28 | $21.25 |
| ELECTRICIAN | $40.64 | $18.29 |
| LINE CONSTRUCTION: LINEMAN | $53.68 | $26.44 |
| POWER EQUIPMENT OPERATOR: ROLLER | $40.17 | $22.29 |
| POWER EQUIPMENT OPERATOR: LOADER | $40.17 | $22.29 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $40.17 | $22.29 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $40.17 | $22.29 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $40.17 | $22.29 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $40.17 | $22.29 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $40.17 | $22.29 |
| IRONWORKER | $39.00 | $34.25 |
| LABORER: PIPELAYER | $36.24 | $15.87 |
| CEMENT MASON/CONCRETE FINISHER | $39.06 | $18.71 |
| TRUCK DRIVER: DUMP TRUCK | $32.95 | $19.49 |
| OPERATOR: CRANE | $34.41 | $11.22 |
| LABORER: COMMON OR GENERAL | $29.16 | $16.33 |
| CARPENTER, EXCLUDES FORM WORK | $27.39 | $7.74 |