Skip to content
Davis-Bacon

MA20260022 (Rev 1)

Coverage: Massachusetts • Norfolk.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)$66.17$37.08
POWER EQUIPMENT OPERATOR GROUP 2 BULLDOZER; GRADER/BLADE; MILLING MACHINE; ROLLER$57.18$33.70
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY$57.83$33.70
IRONWORKER: ORNAMENTAL AND STRUCTURAL$57.87$37.67
LABORER: FENCE ERECTION$38.95$29.70
LABORER: COMMON OR GENERAL$38.95$29.70
LABORER (LANDSCAPE)$38.95$29.70
LABORER (GUARDRAIL INSTALLATION)$38.95$29.70
LABORER: CONCRETE SURFACER$46.20$29.85
PAINTER: STEEL$56.76$36.00
TRUCK DRIVER: FLATBED TRUCK$48.53$0.00
TRUCK DRIVER: DUMP TRUCK$37.74$11.86
TRUCK DRIVER: CONCRETE TRUCK$33.69$15.79
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER$53.35$12.78
TRAFFIC CONTROL: FLAGGER$23.00$20.44
PAINTER: SPRAY (LINESTRIPING)$47.30$6.42
OPERATOR: PILEDRIVER$42.56$17.34
OPERATOR: MECHANIC$48.74$11.79
OPERATOR: FORKLIFT$64.67$0.00
LABORER: JACK HAMMER$38.69$17.33
LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND)$44.43$14.18
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR$33.65$17.32
IRONWORKER, REINFORCING$44.52$19.36
CEMENT MASON/CONCRETE FINISHER$56.70$21.08
CARPENTER, INCLUDES FORM WORK$43.64$22.09

Related Wage Determinations

View directory →