Skip to content
Davis-Bacon

MD20260113 (Rev 0)

Coverage: Maryland • Charles.

Published: Jan 02, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
BALANCING TECHNICIAN$47.92$24.44
BRICKLAYER$37.50$14.78
CARPENTER$34.41$14.55
CARPET LAYER$34.12$14.86
COMMUNICATION INSTALLER TECHNICIAN$33.04$12.36
ELECTRICIAN$55.50$21.97
ELEVATOR MECHANIC$54.77$43.57
FIRESTOPPER$29.81$10.08
GLAZIER$35.60$14.41
INSULATION WORKER$40.02$19.92
IRONWORKER, STRUCTURAL$36.10$25.52
LABORER AIR TOOL OPERATOR$28.95$3.98
ASPHALT PAVER$28.95$3.98
ASPHALT RAKER$29.66$8.08
BLASTER - DYNAMITE$28.95$3.98
BURNER$28.95$3.98
COMMON$29.66$8.08
CONCRETE PUDDLER$29.66$8.08
CONCRETE SURFACER$28.95$3.98
CONCRETE TENDER$29.66$8.08
CONCRETE VIBRATOR$29.66$8.08
DENSITY GAUGE$29.66$8.08
FIREPROOFER - MIXER$29.66$8.08
FLAGGER$29.66$8.08
GRADE CHECKER$29.66$8.08
HAND ROLLER$29.66$8.08
HAZARDOUS MATERIAL HANDLER$28.95$3.98
JACKHAMMER$29.66$8.08
LANDSCAPING$29.66$8.08
LAYOUT$29.66$8.08
LUTEMAN$29.66$8.08
MASON TENDER$28.95$3.98
MORTAR MIXER$29.66$8.08
PIPELAYER$28.95$3.98
PLASTERER - HANDLER$29.66$8.08
SCAFFOLD BUILDER$28.95$3.98
TAMPER$29.66$8.08
MECHANICAL SYSTEMS SERVICE TECH HVAC Systems$52.27$24.58
Refrigeration Systems$52.27$24.58
MILLWRIGHT$38.49$15.86
PAINTER INDUSTRIAL$35.55$15.28
PLUMBER$49.00$22.76
POWER EQUIPMENT OPERATOR BACKHOE$35.00$10.71
BOOM TRUCK$36.72$10.97
CRANE$41.00$18.10
EXCAVATOR$32.35$10.71
FORKLIFT$29.66$8.67
GRADALL$34.00$13.55
LOADER$31.00$7.06
MECHANIC$36.24$14.62
PAVER$23.21$8.71
ROLLER - ASPHALT$22.97$8.72
ROLLER - EARTH$28.60$14.62
SKID STEER (Bobcat)$29.00$5.75
VACUUM TRUCK$37.50$14.85
RESILIENT FLOOR$34.12$14.86
ROOFER/WATERPROOFER$52.21$14.91
SHEETMETAL WORKER (including metal roofing)$47.92$24.44
SPRINKLER FITTER$42.32$26.05
STEAMFITTER/PIPEFITTER$52.27$24.58

Related Wage Determinations

View directory →