Davis-Bacon
MI20260056 (Rev 1)
Coverage: Michigan • Eaton.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| CARPENTER, INCLUDES FORM WORK (TOWNSHIPS OF BELLEVUE, KALAMO, VERMONTVILLE & WALTON) | $28.29 | $21.42 |
| ELECTRICIAN (TOWNSHIPS OF BELLEVUE, BROOKFIELD, KALAMO, SUNFIELD, VERMONTVILLE & WALTON) | $41.00 | $25.74 |
| ELECTRICIAN (TOWNSHIPS OF BENTON, CARMEL, CHESTER, DELTA, EATON, EATON RAPIDS, HAMLIN, ONEIDA, ROXAND AND WINDSOR) | $45.00 | $31.37 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 |
| UIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $35.46 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.32 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $45.68 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $48.98 | $25.25 |
| IRONWORKER: STRUCTURAL | $36.55 | $34.04 |
| IRONWORKER: REINFORCING | $36.55 | $34.04 |
| LABORER ((5) PIPELAYER) | $23.84 | $13.15 |
| LABORER ((4) GRADE CHECKER) | $23.70 | $13.15 |
| LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $23.53 | $13.15 |
| LABORER: GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER (EXCLUDES OPEN CUT CONSTRUCTION) | $32.53 | $13.45 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $21.89 | $11.85 |
| CEMENT MASON/CONCRETE FINISHER | $24.64 | $12.88 |
| PLUMBER/PIPEFITTER | $42.29 | $23.94 |
| TRUCK DRIVER: OFF THE ROAD TRUCK | $20.82 | $3.69 |
| TRUCK DRIVER: DUMP TRUCK | $18.00 | $6.43 |
| LABORER: LANDSCAPE | $12.25 | $0.00 |
| LABORER: COMMON OR GENERAL | $17.75 | $6.40 |
| DAILY | $33.30 | $0.75 |
| DAILY | $33.55 | $0.75 |