Skip to content
Davis-Bacon

MI20260068 (Rev 2)

Coverage: Michigan • Newaygo.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
CARPENTER, INCLUDES FORM WORK$31.50$21.15
ELECTRICIAN$36.52$25.15
POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER$39.95$25.25
POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM)$40.52$25.25
POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER)$41.25$25.25
POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 1 BORING MACHINE, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY)$45.98$25.25
PER HOUR$35.46$25.25
PER HOUR$41.32$25.25
PER HOUR$44.00$25.25
IRONWORKER: STRUCTURAL$36.55$34.04
IRONWORKER: REINFORCING$36.55$34.04
LABORER ((4) GRADE CHECKER)$22.73$12.95
LABORER ((2) MASON TENDER-CEMENT/CONCRETE)$22.55$12.95
LABORER ((1) COMMON OR GENERAL)$22.42$12.95
LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE) (EXCLUDES OPEN CUT CONSTRUCTION)$24.55$13.45
PAINTER: BRUSH, ROLLER AND SPRAY$21.89$11.85
CEMENT MASON/CONCRETE FINISHER$21.15$12.78
PLUMBER$39.80$23.82
TRUCK DRIVER: TRACTOR HAUL TRUCK$16.50$4.89
TRUCK DRIVER: OFF THE ROAD TRUCK$20.82$3.69
TRUCK DRIVER: DUMP TRUCK$17.00$5.71
PIPEFITTER$19.90$5.63
OPERATOR: LOADER$17.41$4.97
OPERATOR: GRADER/BLADE$16.64$0.00
OPERATOR: CRANE$18.50$5.10
OPERATOR: BULLDOZER$21.17$5.84
OPERATOR: BACKHOE/EXCAVATOR$22.61$8.40
LABORER: PIPELAYER$16.00$4.66
LABORER: LANDSCAPE$12.21$1.96
DAILY$33.55$0.75

Related Wage Determinations

View directory →