Skip to content
Davis-Bacon

MI20260071 (Rev 1)

Coverage: Michigan • Saginaw.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
CARPENTER, INCLUDES FORM WORK$35.86$23.69
ELECTRICIAN$40.00$29.95
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER$39.95$25.25
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM)$40.52$25.25
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER)$41.25$25.25
UIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY)$45.98$25.25
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$35.46$25.25
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$41.32$25.25
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$44.00$25.25
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$45.68$25.25
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$48.98$25.25
IRONWORKER: STRUCTURAL$36.55$35.93
IRONWORKER: REINFORCING$36.55$33.37
LABORER ((7) LANDSCAPER)$18.41$12.95
LABORER ((5) PIPELAYER)$22.85$12.95
LABORER ((4) GRADE CHECKER)$22.73$12.55
LABORER ((2) MASON TENDER-CEMENT/CONCRETE)$22.55$12.95
LABORER ((1) COMMON OR GENERAL)$22.42$12.95
LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER$27.71$9.10
LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT)$29.93$9.10
LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER (EXCLUDES OPEN CUT CONSTRUCTION)$27.68$13.45
PAINTER: SPRAY$23.58$12.80
PAINTER: BRUSH & ROLLER$22.58$12.80
CEMENT MASON/CONCRETE FINISHER$25.47$12.38
PLUMBER$38.25$21.07
TRUCK DRIVER: OFF THE ROAD TRUCK$20.82$3.69
DAILY$33.55$0.75
TRUCK DRIVER: DUMP TRUCK, 8 CU. YDS. AND OVER$33.40$0.75
DAILY$33.30$0.75

Related Wage Determinations

View directory →