Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 |
| BOILERMAKER | $43.50 | $36.74 |
| TILE SETTER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $33.31 | $23.20 |
| TILE FINISHER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $28.21 | $20.88 |
| BRICKLAYER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $38.00 | $26.49 |
| CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION & SCAFFOLD BUILDING) | $36.46 | $23.69 |
| CARPENTER (FLOOR LAYER - CARPET, RESILIENT & VINYL FLOORING) | $35.86 | $23.69 |
| MILLWRIGHT | $42.92 | $39.13 |
| ELECTRICIAN (EXCLUDES ALARM INSTALLATION & LOW VOLTAGE WIRING) | $44.83 | $26.96 |
| BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY CREDIT | $65.45 | $38.44 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 |
| IRONWORKER: STRUCTURAL | $36.55 | $35.93 |
| IRONWORKER: REINFORCING | $36.55 | $33.37 |
| IRONWORKER: STRUCTURAL (METAL BUILDING ERECTION ONLY) | $30.02 | $27.43 |
| LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS & CEILINGS) | $39.08 | $15.92 |
| LABORER: LANDSCAPE & IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 |
| LABORER: LANDSCAPE & IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 |
| LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK/CEMENT/CONCRETE, PIPELAYER; SANDBLASTER | $29.46 | $16.10 |
| GLAZIER | $37.41 | $18.99 |
| PAINTER: SPRAY (WEST OF HWY. M-53) | $31.01 | $17.29 |
| PAINTER: BRUSH & ROLER (WEST OF HWY. M-53) | $32.58 | $18.12 |
| DRYWALL FINISHER/TAPER: MACHINE WORK (WEST OF HWY. M-53) | $27.15 | $15.00 |
| DRYWALL FINISHER/TAPER: HAND WORK (WEST OF HWY. M-53) | $27.15 | $15.00 |
| DRYWALL FINISHER/TAPER: DRYWALL SANDING (WEST OF HWY. M-53) | $33.54 | $18.03 |
| PAINTER: DRYWALL FINISHING/TAPING (EAST OF HWY. M-53) | $23.79 | $12.02 |
| PAINTER: BRUSH, ROLLER AND SPRAY (EAST OF HWY. M-53) | $23.79 | $12.02 |
| CEMENT MASON/CONCRETE FINISHER | $27.77 | $12.88 |
| PLASTERER | $30.63 | $14.07 |
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | $46.61 | $22.95 |
| PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION | $46.61 | $22.95 |
| ROOFER | $30.38 | $19.97 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $41.34 | $27.39 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $42.74 | $21.53 |
| TRUCK DRIVER: TRACTOR HAUL TRUCK | $13.57 | $1.18 |
| IRONWORKER, ORNAMENTAL | $18.48 | $7.93 |
| INSTALLER - OVERHEAD DOOR | $27.98 | $0.00 |