Davis-Bacon
MI20260136 (Rev 1)
Coverage: Michigan • Mason.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| BOILERMAKER | $43.50 | $37.64 |
| CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION, AND SOFT FLOOR LAYER-CARPET) | $31.50 | $21.15 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION) | $31.50 | $21.15 |
| MILLWRIGHT | $40.04 | $26.47 |
| ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING (TOWNSHIPS OF AMBER, BRANCH, CUSTER, EDEN, HAMLIN, LOGAN, PERE MARQUETTE, RIVERTON, SHERIDAN, SHERMAN, SUMMIT, & VICTORY) | $35.68 | $23.36 |
| ELECTRICIAN: EXCLUDING LOW VOLTAGE (TOWNSHIPS OF FREESOIL, GRANT & MEADE) | $36.62 | $23.05 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 |
| IRONWORKER: STRUCTURAL | $36.55 | $29.51 |
| IRONWORKER: REINFORCING | $36.55 | $29.51 |
| IRONWORKER: STRUCTURAL (METAL BUILDING ERECTION ONLY) | $30.02 | $27.43 |
| LABORER: MASON TENDER - BRICK/CEMENT/CONCRETE EXCLUDES OPEN CUT CONSTRUCTION | $30.72 | $12.95 |
| LABORER: COMMON OR GENERAL; SANDBLASTER EXCLUDES OPEN CUT CONSTRUCTION | $23.34 | $11.60 |
| CEMENT MASON/CONCRETE FINISHER | $22.02 | $12.38 |
| SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION) | $35.41 | $15.86 |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | $35.41 | $15.86 |
| TRUCK DRIVER: FLATBED TRUCK | $16.80 | $3.97 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $15.65 | $3.12 |
| ROOFER | $15.73 | $7.41 |
| OPERATOR: TRACTOR | $19.60 | $7.31 |
| OPERATOR: ROLLER | $28.02 | $7.07 |
| OPERATOR: GRADER/BLADE | $24.04 | $6.03 |
| OPERATOR: BULLDOZER | $22.34 | $1.22 |
| LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 |
| GLAZIER | $16.95 | $4.74 |
| FLOOR LAYER: CARPET | $19.59 | $7.57 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $19.82 | $7.31 |