Davis-Bacon
MI20260138 (Rev 1)
Coverage: Michigan • Midland.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| BOILERMAKER | $43.50 | $37.64 |
| TILE SETTER | $31.43 | $21.13 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION AND METAL STUD INSTALLATION) | $35.86 | $23.69 |
| MILLWRIGHT | $42.92 | $39.13 |
| ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING (TOWNSHIPS OF INGERSOLL, JASPER, MT. HALEY AND PORTER) | $39.50 | $25.03 |
| ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING (ALL TOWNSHIPS EXCEPT INGERSOLL, JASPER, MT. HALEY, & PORTER) | $40.00 | $26.52 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 |
| IRONWORKER: STRUCTURAL (METAL BUILDING ERECTION ONLY) | $30.02 | $27.43 |
| IRONWORKER: REINFORCING | $36.55 | $33.37 |
| LABORER: SANDBLASTER | $28.21 | $13.45 |
| LABORER (COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE; AND PIPELAYER) | $27.68 | $13.45 |
| PAINTER: DRYWALL FINISHING/TAPING | $30.22 | $22.22 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $29.23 | $19.11 |
| PLASTERER | $26.32 | $12.88 |
| CEMENT MASON/CONCRETE FINISHER | $25.47 | $12.38 |
| PLUMBER (EXCLUDING HVAC PIPE AND SYSTEM INSTALLATION) | $43.50 | $22.10 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $45.50 | $21.75 |
| PIPEFITTER (EXCLUDES HVAC PIPE AND SYSTEM INSTALLATION) | $45.50 | $21.75 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $41.34 | $27.39 |
| SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION) | $26.83 | $23.78 |
| TRUCK DRIVER: FLATBED TRUCK | $14.40 | $2.31 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $15.65 | $3.12 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $17.57 | $11.51 |
| ROOFER | $15.73 | $7.41 |
| OPERATOR: TRACTOR | $19.60 | $7.31 |
| OPERATOR: ROLLER | $28.02 | $7.07 |
| OPERATOR: GRADER/BLADE | $24.04 | $6.03 |
| OPERATOR: BULLDOZER | $22.34 | $1.22 |
| LABORER: MASON TENDER - BRICK | $14.25 | $3.89 |
| LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 |
| IRONWORKER, STRUCTURAL | $19.75 | $11.54 |
| GLAZIER | $16.95 | $4.74 |
| FLOOR LAYER: CARPET | $19.27 | $7.57 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $20.38 | $4.88 |
| CARPENTER (FORM WORK ONLY) | $20.00 | $1.22 |
| CARPENTER (DRYWALL HANGING ONLY) | $18.98 | $0.00 |
| BRICKLAYER | $21.43 | $5.72 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $16.19 | $4.53 |