| Occupation | Base | Fringe |
|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 |
| BOILERMAKER | $43.50 | $37.64 |
| TILE SETTER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $33.31 | $23.20 |
| PLASTERER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $34.43 | $24.44 |
| BRICKLAYER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $38.00 | $26.49 |
| CARPENTER (EXCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION, AND SOFT FLOOR LAYER - CARPET) | $35.86 | $23.69 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | $36.46 | $23.69 |
| MILLWRIGHT | $42.92 | $39.13 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 |
| IRONWORKER: STRUCTURAL (METAL BUILDING ERECTION ONLY) | $30.02 | $27.43 |
| IRONWORKER, STRUCTURAL | $36.55 | $35.93 |
| IRONWORKER, REINFORCING | $36.55 | $33.37 |
| LABORER (COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; PIPELAYER; AND SANDBLASTER) | $29.46 | $16.10 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL D) | $31.01 | $17.29 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $31.01 | $17.19 |
| PAINTER: SPRAY | $31.01 | $17.29 |
| PAINTER: BRUSH & ROLER | $32.58 | $18.12 |
| DRYWALL FINISHER/TAPER (DRYWALL SANDING) | $33.54 | $18.12 |
| CEMENT MASON/CONCRETE FINISHER | $25.58 | $12.88 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION & EXCLUDES HVAC SYSTEM INSTALLATION) | $46.61 | $22.95 |
| PLUMBER (EXCLUDES HVAC PIPE & SYSTEM INSTALLATION) | $46.61 | $22.95 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $41.34 | $27.39 |
| SHEET METAL WORKER (INCLDUING HVAC DUCT & SYSTEM INSTALLATION) | $35.19 | $23.57 |
| TRUCK DRIVER: FLATBED TRUCK | $16.80 | $3.97 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $15.65 | $3.12 |
| ROOFER | $15.73 | $7.41 |
| OPERATOR: TRACTOR | $19.60 | $7.31 |
| OPERATOR: ROLLER | $28.02 | $7.07 |
| OPERATOR: GRADER/BLADE | $24.04 | $6.03 |
| OPERATOR: BULLDOZER | $22.34 | $1.22 |
| LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 |
| GLAZIER | $16.95 | $4.74 |
| FLOOR LAYER: CARPET | $19.59 | $7.57 |