Davis-Bacon
MN20260024 (Rev 2)
Coverage: Minnesota • Clay, Houston, Polk.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| CARPENTER (HOUSTON) | $36.71 | $20.17 |
| CARPENTER (CLAY, POLK) | $31.14 | $20.69 |
| ELECTRICIAN (HOUSTON) | $40.25 | $23.32 |
| ELECTRICIAN (CLAY, POLK) | $37.41 | $18.61 |
| OPERATOR: POWER EQUIPMENT GROUP 8 OILER. (CLAY, POLK) | $26.80 | $15.85 |
| OPERATOR: POWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE. (CLAY, POLK) | $29.75 | $15.85 |
| OPERATOR: POWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2. (CLAY, POLK) | $31.17 | $15.85 |
| OPERATOR: POWER EQUIPMENT GROUP 4 BACKHOE (CLAY, POLK) | $31.33 | $15.85 |
| OPERATOR: POWER EQUIPMENT GROUP 2 GRADER/BLADE (CLAY, POLK) | $32.98 | $15.85 |
| OPERATOR: POWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE. (HOUSTON) | $31.42 | $15.85 |
| OPERATOR: POWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2.(HOUSTON) | $32.93 | $15.85 |
| OPERATOR: POWER EQUIPMENT GROUP 4 BACKHOE (HOUSTON) | $33.10 | $15.85 |
| OPERATOR: POWER EQUIPMENT GROUP 2 GRADER/BLADE (HOUSTON) | $34.85 | $15.85 |
| IRONWORKER: STRUCTURAL (CLAY, POLK) | $42.89 | $36.86 |
| IRONWORKER: STRUCTURAL (HOUSTON) | $46.35 | $36.86 |
| LABORERS: (3) MASON TENDER (BRICK, CEMENT/CONCRETE) (HOUSTON) | $25.42 | $17.52 |
| LABORERS: (2) PIPELAYER (HOUSTON) | $27.95 | $17.52 |
| LABORERS: (1) COMMON OR GENERAL (HOUSTON) | $27.25 | $17.52 |
| ADDITIONAL PER HOUR | $20.96 | $14.97 |
| ADDITIONAL PER HOUR | $20.21 | $14.97 |
| LABORERS: COMMON OR GENERAL LABORER, MASON TENDER (BRICK,CEMENT/CONCRETE), PIPELAYER (CLAY (CITY OF MOORHEAD) COUNTY | $18.60 | $13.44 |
| LABORERS: COMMON OR GENERAL LABORER, MASON TENDER (BRICK,CEMENT/CONCRETE), PIPELAYER (POLK (CITY OF EAST GRAND FORKS) COUNTY) | $20.87 | $17.39 |
| k and over) | $28.47 | $21.74 |
| k and over) | $28.07 | $21.74 |
| PAINTER: SPRAY (HOUSTON) | $19.00 | $3.00 |
| PAINTER: SPRAY (CLAY, POLK) | $22.61 | $8.66 |
| PLUMBER (HOUSTON) | $47.50 | $30.33 |
| PLUMBER (CLAY, POLK) | $48.74 | $21.34 |
| ROOFER (CLAY, POLK) | $36.01 | $16.72 |
| ROOFER (HOUSTON) | $32.71 | $16.99 |
| SHEET METAL WORKER (POLK) | $35.37 | $21.12 |
| SHEET METAL WORKER (CLAY) | $35.76 | $23.17 |
| SHEET METAL WORKER (HOUSTON) | $40.03 | $28.95 |
| LABORER: LANDSCAPE | $11.50 | $0.00 |