Skip to content
Davis-Bacon

MN20260026 (Rev 1)

Coverage: Minnesota • Cook, Koochiching, Lake.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS)$53.18$23.83
BOILERMAKER$48.00$31.14
MARBLE SETTER$45.47$26.33
TILE LAYER (KOOCHICHING)$32.54$30.66
TILE FINISHER$25.23$22.05
BRICKLAYER (COOK, LAKE)$42.19$31.19
TILE LAYER (COOK, LAKE)$32.54$30.66
BRICKLAYER (KOOCHICHING COUNTY)$39.35$26.73
SOFT FLOOR LAYER$43.25$24.19
CARPENTER (COOK, LAKE (SOUTH PART, EXCLUDING SAWBILL LANDING))$31.52$17.64
LATHER$33.55$26.08
CARPENTER (KOOCHICHING, LAKE (NORTHERN PART, INCLUDING SAWBILL LANDING))$28.29$22.88
MILLWRIGHT (COOK, KOOCHICHING, LAKE)$40.55$27.36
DAYS PAID VACATION B. 8 PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; 4TH OF JULY; LABOR DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; THE NORMAL WORK DAY PRECEDING CHRISTMAS DAY; & CHRISTMAS DAY$38.97$17.14
DAYS PAID VACATION B. 8 PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; 4TH OF JULY; LABOR DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; THE NORMAL WORK DAY PRECEDING CHRISTMAS DAY; & CHRISTMAS DAY$27.30$14.31
ELECTRICIAN (COOK, LAKE)$47.46$33.34
ELECTRICIANS:: (2) ALL OTHER WORK (KOOCHICHING)$45.83$32.90
ELECTRICIANS:: (1) UP TO & INCLUDING 6-PLEX UNDER ONE ROOF (KOOCHICHING)$39.18$29.68
FOR 6 MONTHS TO 5 YEARS OF SERVICE. B.PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY$62.52$38.44
OPERATOR: POWER EQUIPMENT GROUP 8 MECHANICAL SPACE HEATER (TEMPORARY HEAT); OILER OR GREASER; & ELEVATOR OPERATOR$39.88$25.20
R COMPRESSOR OPERATOR 600 CFM OR OVER; PUMP AND/OR CONVEYOR OPERATOR; BRAKEMAN; PICK-UP SWEEPER (1 CU. YD. & OVER HOPPER CAPACITY); TRUCK CRANE OILER; & WELDING MACHINE OPERATOR, FIREMAN TEMPORARY HEAT$42.06$25.20
OPERATOR: POWER EQUIPMENT GROUP 6 CONCRETE BATCH PLANT OPERATOR; GUNITE OPERATOR; TRACTOR OPERATOR D2 OR SIMILAR SIZE; & FRONT END LOADER OPERATOR, UP TO 1 CU. YD$43.28$25.20
OVER 1 CU. YD.); HOIST ENGINEER (1 OR 2 DRUMS); STRADDLE CARRIER OPERATOR; POWER PLANT ENGINEER (100 KW & OVER ON MULTIPLES EQUAL TO 100KW & OVER); TRACTOR OPERATOR OVER D2; & WELL POINT PUMP OPERATOR$44.91$25.20
OPERATOR: POWER EQUIPMENT GROUP 4 CRAWLER BACKHOE; HOIST ENGINEER (3 DRUMS OR MORE); LOCOMOTIVE OPERATOR; OVERHEAD CRANE OPERATOR (INSIDE BUILDING PERIMETER); & TRACTOR OPERATOR WITH BOOM$46.99$25.20
ARE USED); TRUCK & CRAWLER CRANE, UP TO BUT NOT INCLUDING 150' OF BOOM, INCLUDING JIB; DERRICK (GUY & STIFFLEG); TOWER CRANE (STATIONARY) UP TO 200'; & ALLTERRAIN VEHICLE CRANE, BOOM TRUCK OVER 100 FT$47.35$25.20
OPERATOR: POWER EQUIPMENT GROUP 2 TRUCK & CRAWLER CRANE WITH 150' OF BOOM, UP TO BUT NOT INCLUDING 200' OF BOOM, INCLUDING JIB; & TOWER CRANE 200' & OVER, CONCRETE PUMP 164 FT BOOM$48.88$25.20
PREMIUM WITH 300' OF BOOM & OVER, INCLUDING JIB); & TOWER CRANE 250' & OVER$49.25$25.20
IRONWORKER$39.14$34.11
LANDSCAPE LABORER (COOK AND LAKE COUNTIES)$26.89$19.31
OUP 4 DRILLER FOR BLASTING PURPOSES; DYNAMITE BLASTERS OR SUBSTITUTE PRODUCTS TOVEX TR, WATER, GAS, GEL, BRISTAR, SILENT DYNAMITE, ETC.; ASBESTOS ABATEMENT WORKER; & HAZARDOUS WASTE WORKER (COOK, LAKE)$30.62$21.69
NT, SANDBLASTING; PIPELAYER; REFRACTORY WORKER; SHEETING SETTER & DRIVER, HEAVY BUILDING EXCAVATION; UNDERGROUND WORK - OPEN DITCH OR EXCAVATION 8' BELOW GRADE; UNDERPINNING; & HOD CARRIER (COOK, LAKE)$30.32$21.69
SCAFFOLDING); TORCHMAN - GAS, ELECTRIC, THERMAL OR SIMILAR DEVICE; & HYDROBLAST (COOK, LAKE)$30.07$21.69
HOT TAR CAULKER - CORKER; JOIST HANDLER; REBAR; SNOW BLOWER OPERATOR; SIGNALPERSON; MATERIAL HANDLER (ALL TYPES POWER BUGGY); FIRE CONTROL; ASBESTOS REMOVAL; & HAZARDOUS WASTE, FLAG PERSON (COOK, LAKE)$29.92$21.69
LANDSCAPE LABORER (KOOCHICHING COUNTY)$26.89$19.31
LABORER GROUP 4 (KOOCHICHING)$22.62$16.25
LABORER GROUP 3 (KOOCHICHING)$21.32$16.25
LABORER GROUP 2 (KOOCHICHING)$21.02$16.25
LABORER GROUP 1 (KOOCHICHING)$20.62$16.25
PAINTER (PAPERHANGING; SPRAY; STEEL; TAPING; & LEAD BASE PAINT REMOVAL & ABATEMENT WITH OTHER THAN BASIC HAND TOOLS)$28.96$16.35
PAINTER (BRUSH; ROLLER; & LEAD BASE PAINT REMOVAL & ABATEMENT WITH BASIC HAND TOOLS SUCH AS SCRAPERS)$28.36$16.35
GLAZIER: FOOTNOTE: 1 TO 4 YEARS' SERVICE - 1 WEEK'S PAID VACATION; 5 TO 11 YEARS SERVICE - 2 WEEKS PAID VACATION; 11 OR MORE YEARS SERVICE - 3 WEEKS PAID VACATION$30.17$17.47
PLASTERER (KOOCHICHING)$30.72$18.33
PLASTERER (COOK, LAKE)$38.24$23.23
CEMENT MASON/CONCRETE FINISHER (COOK, LAKE)$39.91$21.63
PLUMBER, PIPEFITTER, STEAMFITTER (COOK (A STRIP 20 MILES INLAND ALONG THE SHORES OF LAKE SUPERIOR), LAKE (A STRIP 20 MILES INLAND ALONG THE SHORES OF LAKE SUPERIOR)S)$52.24$27.56
Fringes PLUMBER, PIPEFITTER, STEAMFITTER (COOK (EXCEPT A STRIP 20 MILES INLAND ALONG THE SHORES OF LAKE SUPERIOR), KOOCHICHING, LAKE (EXCEPT A STRIP 20 MILES INLAND ALONG THE SHORES OF LAKE SUPERIOR))$48.55$29.33
ROOFER (COOK, LAKE)$45.12$23.15
ROOFER (KOOCHICHING)$40.39$20.53
SPRINKLER FITTER$42.94$27.26
SHEET METAL WORKER (COOK, LAKE)$33.36$24.25
SHEET METAL WORKER (KOOCHICHING)$29.85$24.33
TRUCK DRIVER GROUP 4 DUMPMAN, FARM TRACTOR, SINGLE OR 2 AXLE TRUCK$35.79$24.13
TRUCK DRIVER GROUP 3 FORK LIFT, MECHANIC, TANDEM OR 3 AXLE TRUCK$36.06$24.13
TRUCK DRIVER GROUP 2 READY MIX, TRACTOR TRAILOR$36.27$24.13
TRUCK DRIVER GROUP 1 BOOM TRUCK$37.95$24.13

Related Wage Determinations

View directory →