Davis-Bacon
MN20260066 (Rev 1)
Coverage: Minnesota • Le Sueur.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| WIRING SYSTEMS INSTALLER | $33.44 | $17.82 |
| WIRING SYSTEM TECHNICIAN | $47.73 | $22.24 |
| UNDERGROUND AND OPEN DITCH LABORER (EIGHT FEET BELOW STARTING GRADE LEVEL) | $38.14 | $24.68 |
| TUNNEL MINER | $32.01 | $21.84 |
| MP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS; TWO AXLE UNIT; SLURRY OPERATOR; TANK TRUCK HELPER (GAS, OIL, ROAD OIL, AND WATER); TRACTOR OPERATOR, UNDER 50 H.P | $18.00 | $6.00 |
| TRUCK DRIVER: GROUP 3: BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR (ONE PERSON OPERATION); THREE AXLE UNITS | $24.00 | $6.50 |
| TRUCK DRIVER: GROUP 2: FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK | $33.00 | $8.75 |
| TRUCK DRIVER: GROUP 1: MECHANIC; TRACTOR TRAILER DRIVER; TRUCK DRIVER (HAULING MACHINERY INCLUDING OPERATION OF HAND AND POWER OPERATED WINCHES) | $33.00 | $8.75 |
| TILE SETTER | $37.92 | $21.50 |
| TILE FINISHER | $24.92 | $7.75 |
| TERRAZZO WORKER | $45.32 | $22.29 |
| UREMENT; MARK AND DRIVE STAKES; HAND OR POWER DIGGING FOR AND IDENTIFICATION OF MARKERS OR MONUMENTS; PERFORM AND CHECK CALCULATIONS; REVIEW AND UNDERSTAND CONSTRUCTION PLANS AND LAND SURVEY MATERIALS) | $34.50 | $24.15 |
| SPRINKLER FITTER | $43.53 | $26.67 |
| SIGN ERECTOR | $34.69 | $19.88 |
| SHEET METAL WORKER | $36.76 | $22.43 |
| ROOFER | $44.00 | $6.74 |
| TABLE NOT CRUSHING OR WASHING); LEVER PERSON; POWER SWEEPER; SHEEP FOOT ROLLER AND ROLLERS ON GRAVEL COMPACTION, INCLUDING VIBRATING ROLLERS; TRACTOR, WHEEL TYPE, OVER 50 H.P., UNRELATED TO LANDSCAPING | $26.00 | $8.75 |
| P FOOT COMPACTOR WITH BLADE . 200 H.P. AND OVER; SHOULDERING MACHINE (POWER) APSCO OR SIMILAR TYPE INCLUDING SELF-PROPELLED SAND AND CHIP SPREADER; STUMP CHIPPER AND TREE CHIPPER; TREE FARMER (MACHINE) | $38.99 | $26.40 |
| PROPELLED SOIL STABILIZER; SLIP FORM (POWER DRIVEN) (PAVING); TIE TAMPER AND BALLAST MACHINE; TRACTOR, WHEEL TYPE, OVER 50 H.P. WITH PTO UNRELATED TO LANDSCAPING; TUB GRINDER, MORBARK, OR SIMILAR TYPE | $28.50 | $8.75 |
| STABILIZER PLANT; CABLEWAY; DERRICK (GUY OR STIFFLEG)(POWER)(SKIDS OR STATIONARY); DREDGE OR ENGINEERS, DREDGE (POWER) AND ENGINEER; LOCOMOTIVE CRANE OPERATOR; TANDEM SCRAPER; TUGBOAT 100 H.P AND OVER | $33.00 | $8.75 |
| POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 2: GRADER OR MOTOR PATROL; TUGBOAT 100 H.P. AND OVER WHEN LICENSE REQUIRED | $30.00 | $8.75 |
| POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 8: ELEVATOR OPERATOR; GREASER; MECHANICAL SPACE HEATER (TEMPORARY HEAT NO BOILER LICENSE REQUIRED) | $41.28 | $26.40 |
| ILER LICENSE; OILER (POWER SHOVEL, CRANE, TRUCK CRANE, DRAGLINE, CRUSHERS AND MILLING MACHINES, OR OTHER SIMILAR POWER EQUIPMENT); PICK UP SWEEPER (ONE CUBIC YARD HOPPER CAPACITY); PUMP AND/OR CONVEYOR | $43.55 | $26.90 |
| ANT; FIREPERSON, FIRST CLASS BOILER LICENSE; FRONT END, SKID STEER UP TO 1 C YD; GUNITE MACHINE; TRACTOR OPERATOR D2 OR SIMILAR SIZE; TRENCHING MACHINE (SEWER, WATER, GAS) EXCLUDES WALK BEHIND TRENCHER | $43.28 | $25.20 |
| EQUAL TO 100KW AND OVER); PUMP OPERATOR AND/OR CONVEYOR (TWO OR MORE MACHINES); SELF-ERECTING TOWER CRANE UNDER 100 FEET MEASURED FROM BOOM FOOT PIN; STRADDLE CARRIER; TRACTOR OVER D2; WELL POINT PUMP | $46.51 | $26.90 |
| RCIAL GROUP 4: CRAWLER BACKHOE INCLUDING ATTACHMENTS; FIREPERSON, CHIEF BOILER LICENSE; HOIST ENGINEER (THREE DRUMS OR MORE); LOCOMOTIVE; OVERHEAD CRANE (INSIDE BUILDING PERIMETER); TRACTOR . BOOM TYPE | $48.68 | $26.90 |
| G TOWER CRANE 100 FEET AND OVER MEASURED FROM BOOM FOOT PIN; STATIONARY TOWER CRANE UP TO 200 FEET; TRAVELING TOWER CRANE; TRUCK OR CRAWLER CRANE UP TO AND NOT INCLUDING 150 FEET OF BOOM, INCLUDING JIB | $49.05 | $26.90 |
| FEET AND OVER; CONCRETE PUMP WITH 50 METERS/164 FEET OF BOOM AND OVER; PILE DRIVING WHEN THREE DRUMS IN USE; TRUCK OR CRAWLER CRANE WITH 150 FEET OF BOOM UP TO AND NOT INCLUDING 200 FEET, INCLUDING JIB | $50.64 | $26.90 |
| POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 1: HELICOPTER PILOT; TOWER CRANE 250 FEET AND OVER; TRUCK CRAWLER CRANE WITH 200 FEET OF BOOM AND OVER, INCLUDING JIB | $51.03 | $26.90 |
| PLUMBER | $41.62 | $27.17 |
| PLASTERER | $41.75 | $18.48 |
| PIPELAYER (WATER, SEWER AND GAS) | $40.14 | $24.68 |
| PIPEFITTER/STEAMFITTER | $41.52 | $27.27 |
| PILEDRIVER (INCLUDING VIBRATORY DRIVER OR EXTRACTOR FOR PILING AND SHEETING OPERATIONS) | $41.01 | $25.03 |
| PAVEMENT MARKING OR MARKING REMOVAL EQUIPMENT ((ONE OR TWO PERSON OPERATORS); SELF-PROPELLED TRUCK OR TRAILER MOUNTED UNITS.) | $21.25 | $5.00 |
| PAINTER (INCLUDING HAND BRUSHED, HAND SPRAYED, AND THE TAPING OF PAVEMENT MARKINGS) | $34.28 | $24.83 |
| MILLWRIGHT | $41.66 | $35.40 |
| LATHER | $36.55 | $26.85 |
| SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICLLY SEEDING, SODDING, OR PLANT, AND TWO-FRAMED FORKLIFT (EXCLUDING FRONT, POSIT-TRACK, AND SKID STEER LOADERS), NO EARTHWORK OR GRADING FOR ELEVATIONS) | $30.04 | $21.53 |
| LABORER: SKILLED (ASSISTING SKILLED CRAFT JOURNEYMAN) | $34.50 | $24.15 |
| LABORER: LANDSCAPE (GARDENER, SOD LAYER AND NURSERY OPERATOR) | $30.04 | $21.53 |
| LABORER: COMMON OR GENERAL (GENERAL LABOR WORK) | $34.50 | $24.15 |
| IRONWORKER | $44.85 | $35.72 |
| HEATING AND FROST INSULATORS | $53.19 | $31.95 |
| GLAZIER | $48.98 | $26.75 |
| FLAG PERSON | $27.85 | $21.17 |
| ELEVATOR CONSTRUCTORS | $62.52 | $45.36 |
| ELECTRICIAN | $48.37 | $26.13 |
| DRYWALL TAPER | $33.66 | $25.04 |
| CEMENT MASON | $52.01 | $13.63 |
| CARPET LAYER (LINOLEUM) | $39.03 | $25.43 |
| CARPENTER | $36.55 | $29.03 |
| BRICKLAYER | $48.38 | $26.38 |
| BOOM TRUCK | $35.25 | $5.46 |
| BOILERMAKER | $48.35 | $31.93 |
| BLASTER | $23.87 | $17.67 |
| ASBESTOS ABATEMENT WORKER | $41.23 | $25.99 |
| ARTICULATED HAULER | $41.73 | $22.85 |