Davis-Bacon
MO20260027 (Rev 1)
Coverage: Missouri • Wright.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $31.97 | $14.00 |
| BRICKLAYER | $33.67 | $19.48 |
| TILE SETTER | $26.47 | $14.89 |
| CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $29.50 | $21.50 |
| ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS) | $32.40 | $19.11 |
| MONTHS TO 5 YEARS AS VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY | $60.69 | $38.44 |
| POWER EQUIPMENT OPERATOR: ROLLER | $30.91 | $18.07 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $31.62 | $18.07 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $31.62 | $18.07 |
| POWER EQUIPMENT OPERATOR: (LOADER) | $31.62 | $18.07 |
| IRONWORKER: REINFORCING AND STRUCTURAL | $41.67 | $31.25 |
| LABORER (COMMON OR GENERAL & LANDSCAPE) | $27.05 | $13.62 |
| LABORER (BRICK MASON TENDER) | $29.78 | $13.62 |
| PAINTER: DRYWALL FINISHING/TAPING ONLY (DADE, DOUGLAS, HICKORY, OZARK, ST. CLAIR, STONE, & TANEY COUNTIES) | $25.79 | $15.35 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $39.35 | $15.72 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $39.35 | $15.72 |
| ROOFER | $30.73 | $14.51 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $34.43 | $17.86 |
| TRUCK DRIVER: DUMP TRUCK | $28.92 | $0.00 |
| PAINTER: SPRAY | $18.79 | $8.12 |
| OPERATOR: WATER TRUCK | $28.37 | $0.00 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.47 | $0.00 |
| OPERATOR: BACKHOE/TRACKHOE | $23.55 | $7.47 |
| GLAZIER | $22.71 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $17.95 | $6.64 |