Davis-Bacon
MO20260029 (Rev 1)
Coverage: Missouri • Barry, Barton, Benton.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $31.97 | $14.00 |
| TILE SETTER (BENTON COUNTY) | $32.79 | $21.31 |
| BRICKLAYER (BENTON COUNTY) | $32.79 | $21.31 |
| BRICKLAYER (BARRY & BARTON COUNTIES) | $33.67 | $19.48 |
| TILE SETTER (BARRY & BARTON COUNTIES) | $26.47 | $14.89 |
| CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION (BENTON COUNTY) | $31.51 | $22.25 |
| CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION (BARRY & BARTON COUNTIES) | $29.50 | $21.50 |
| ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS (BARRY & BARTON COUNTIES) | $32.25 | $20.81 |
| ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS (BENTON COUNTY) | $51.01 | $26.25 |
| MONTHS TO 5 YEARS AS VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY | $60.69 | $38.44 |
| POWER EQUIPMENT OPERATOR: ROLLER (BARRY & BARTON COUNTIES) | $30.91 | $18.07 |
| POWER EQUIPMENT OPERATOR: LOADER (BARRY & BARTON COUNTIES) | $31.62 | $18.07 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (BARRY & BARTON COUNTIES) | $31.62 | $18.07 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (BARRY & BARTON COUNTIES) | $31.62 | $18.07 |
| POWER EQUIPMENT OPERATOR: ROLLER (BENTON COUNTY) | $45.48 | $22.42 |
| POWER EQUIPMENT OPERATOR: LOADER (BENTON COUNTY) | $45.48 | $22.42 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (BENTON COUNTY) | $45.48 | $22.42 |
| IRONWORKER: REINFORCING AND STRUCTURAL (BARRY COUNTY) | $36.00 | $34.25 |
| IRONWORKER, REINFORCING AND STRUCTURAL (BARTON & BENTON COUNTIES) | $36.00 | $34.25 |
| LABORER: COMMON OR GENERAL & LANDSCAPE (BARTON & BENTON COUNTIES) | $26.50 | $13.18 |
| LABORER: BRICK MASON TENDER (BARTON & BENTON COUNTIES) | $28.00 | $13.18 |
| LABORER: COMMON OR GENERAL & LANDSCAPE (BARRY COUNTY) | $27.05 | $13.62 |
| LABORER: BRICK MASON TENDER (BARRY COUNTY) | $29.78 | $13.62 |
| PAINTER: DRYWALL FINISHING/TAPING ONLY (BENTON COUNTY) | $25.39 | $17.76 |
| PAINTER: BRUSH & ROLLER ONLY (BENTON COUNTY) | $24.43 | $17.76 |
| PAINTER (DRYWALL FINISHING/TAPING ONLY) | $25.79 | $15.35 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (BENTON COUNTY) | $58.38 | $25.29 |
| UNDER) | $31.28 | $15.32 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION BARRY COUNTY | $37.15 | $15.42 |
| UNDER) | $32.78 | $15.32 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION BARRY COUNTY | $37.15 | $15.42 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (BENTON COUNTY) | $57.51 | $28.35 |
| ROOFER | $30.73 | $14.51 |
| SHEET METAL WORKER (BARTON & BENTON COUNTIES) | $47.20 | $26.28 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION (BARRY COUNTY) | $34.43 | $17.86 |
| TRUCK DRIVER: DUMP TRUCK | $28.92 | $0.00 |
| PAINTER: SPRAY | $18.79 | $8.12 |
| OPERATOR: WATER TRUCK | $28.37 | $0.00 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.47 | $0.00 |
| OPERATOR: BACKHOE/TRACKHOE | $23.55 | $7.47 |
| GLAZIER | $22.71 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $17.95 | $6.64 |