Davis-Bacon
MO20260062 (Rev 1)
Coverage: Missouri • Franklin.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| BRICKLAYER | $41.15 | $23.90 |
| CARPENTER (DRYWALL HANGING ONLY) | $36.90 | $21.55 |
| ELECTRICIAN | $44.36 | $11.53 |
| POWER EQUIPMENT OPERATOR: ROLLER | $41.01 | $29.63 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR | $41.01 | $29.63 |
| AND OVER:) | $33.48 | $14.86 |
| AND OVER:) | $33.68 | $14.86 |
| PAINTER: BRUSH & ROLLER | $38.60 | $17.66 |
| PAINTER (DRYWALL FINISHING/TAPING) | $38.60 | $17.66 |
| PLUMBER | $52.60 | $29.93 |
| ROOFER | $40.00 | $22.05 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $52.32 | $28.96 |
| SHEET METAL WORKER (INCLUDING INSTALLATION OF HVAC DUCT AND HVAC SYSTEM) | $52.00 | $27.12 |
| CEMENT MASON/CONCRETE FINISHER | $16.00 | $0.00 |
| CARPENTER, EXCLUDES DRYWALL HANGING | $18.85 | $0.00 |