Davis-Bacon
MO20260083 (Rev 1)
Coverage: Missouri • Bollinger, Cape Girardeau.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | $43.48 | $27.24 |
| BRICKLAYER | $41.15 | $23.90 |
| TILE SETTER | $34.09 | $20.36 |
| CARPENTER | $32.59 | $22.40 |
| ELECTRICIAN | $49.29 | $33.64 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $43.46 | $30.22 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $43.46 | $30.22 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $43.46 | $30.22 |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | $30.38 |
| POWER EQUIPMENT OPERATOR: OILER | $39.06 | $30.38 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $45.96 | $30.57 |
| POWER EQUIPMENT OPERATOR: CRANE | $45.96 | $30.57 |
| IRONWORKER | $44.27 | $31.65 |
| LABORER: PIPELAYER | $40.82 | $17.56 |
| LABORER: COMMON OR GENERAL | $30.48 | $14.91 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $31.80 | $14.91 |
| PAINTER | $39.40 | $17.66 |
| CEMENT MASON/CONCRETE FINISHER | $38.46 | $20.15 |
| PIPEFITTER | $52.60 | $29.93 |
| PLUMBER | $52.60 | $29.93 |
| ROOFER | $32.25 | $17.46 |
| SHEET METAL WORKER | $52.00 | $27.12 |
| OPERATOR: ROLLER | $39.61 | $30.15 |
| LABORER: MASON TENDER - BRICK | $37.58 | $17.21 |
Related Wage Determinations
View directory →Davis-Bacon
MO20260015 (Rev 1)
Missouri • New Madrid
Davis-Bacon
MO20260030 (Rev 1)
Missouri • Carter, Howell, Iron +7
Davis-Bacon
MO20260032 (Rev 2)
Missouri • Dade, Douglas, Henry +6
Davis-Bacon
MO20260084 (Rev 1)
Missouri • Boone, Howard
Davis-Bacon
MO20260009 (Rev 2)
Missouri • Chariton
Davis-Bacon
MO20260022 (Rev 1)
Missouri • Scott