Davis-Bacon
MT20260005 (Rev 1)
Coverage: Montana • Missoula.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| TRUCK DRIVERS: (3) COMBINATION TRUCK, CONCRETE MIXER, TRANSIT MIXER | $11.10 | $1.66 |
| TRUCK DRIVERS: (2) FLATBED: (OVER 3 TONS) | $11.20 | $1.66 |
| TRUCK DRIVERS: (2) FLATBED: (3 TONS AND UNDER) | $11.00 | $1.66 |
| TRUCK DRIVERS: (1) PICKUP | $10.95 | $1.66 |
| TERRAZZO & TILE SETTER | $14.45 | $1.45 |
| SHEET METAL WORKER | $15.38 | $2.05 |
| ROOFER | $13.65 | $1.80 |
| POWER EQUIPMENT OPERATOR: FRONT END LOADER: 1 TO 3 CU YD | $12.96 | $2.42 |
| POWER EQUIPMENT OPERATOR: FRONT END LOADER: 1 CU YD OR LESS | $12.67 | $2.42 |
| PLUMBER | $15.78 | $1.60 |
| PLASTERER | $10.50 | $1.10 |
| PAINTER | $10.93 | $1.38 |
| LABORERS: UNSKILLED | $9.32 | $1.20 |
| LABORERS: (PIPELAYER) | $9.72 | $1.20 |
| IRONWORKER | $17.18 | $6.18 |
| ELECTRICIAN | $13.10 | $2.49 |
| CEMENT MASON/CONCRETE FINISHER | $10.50 | $1.10 |
| CARPENTER | $13.03 | $3.31 |
| BRICKLAYER | $14.45 | $1.45 |