Skip to content
Davis-Bacon

NC20260066 (Rev 1)

Coverage: North Carolina • Duplin, Lee, Lenoir +2.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
PIPEFITTER (EXCLUDING HVAC SYSTEM INSTALLATION)$31.66$12.69
TRUCK DRIVER: DUMP TRUCK$13.14$1.01
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION$13.09$1.28
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$15.29$0.00
ROOFER$13.55$0.80
PLUMBER, EXCLUDES HVAC UNIT INSTALLATION$17.42$2.29
PAINTER: BRUSH, ROLLER AND SPRAY$14.60$1.97
OPERATOR: GRADER/BLADE$15.71$1.49
OPERATOR: CRANE$19.25$2.37
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$17.98$0.91
LABORER: MASON TENDER-BRICK/CEMENT/CONCRETE$11.31$0.00
LABORER: LANDSCAPE & IRRIGATION$10.29$1.82
LABORER: COMMON OR GENERAL$10.53$1.39
IRONWORKER, STRUCTURAL$18.75$5.62
HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT)$15.41$2.60
GLAZIER$18.16$0.87
FORM WORKER$16.08$3.48
ELECTRICIAN$17.36$3.07
CEMENT MASON/CONCRETE FINISHER$14.02$0.00
CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK$15.93$2.99
CARPENTER (DRYWALL HANGING ONLY)$18.13$1.31
BRICKLAYER$19.09$8.73

Related Wage Determinations

View directory →