Davis-Bacon
NM20260037 (Rev 1)
Coverage: New Mexico • Cibola, Colfax, Guadalupe +9.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| TRUCK DRIVER: WATER TRUCK | $13.13 | $0.26 |
| TRUCK DRIVER: PICKUP AND PILOT CAR | $12.74 | $0.26 |
| TRUCK DRIVER: FLATBED TRUCK (RIO ARRIBA) | $12.95 | $0.26 |
| TRUCK DRIVER: FLATBED TRUCK (QUAY, SAN MIGUEL) | $13.30 | $0.26 |
| TRUCK DRIVER: FLATBED TRUCK (MCKINLEY) | $13.55 | $0.26 |
| TRUCK DRIVER: FLATBED TRUCK (COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MORA, TAOS, UNION) | $13.27 | $0.26 |
| TRUCK DRIVER: FLATBED TRUCK (CIBOLA) | $12.71 | $0.26 |
| TRUCK DRIVER: DUMP TRUCK (QUAY) | $15.20 | $0.26 |
| TRUCK DRIVER: DUMP TRUCK (MCKINLEY) | $13.15 | $0.26 |
| TRUCK DRIVER: DUMP TRUCK (COLFAX, SAN MIGUEL) | $13.24 | $0.26 |
| TRUCK DRIVER: DISTRIBUTOR | $13.56 | $0.26 |
| TRUCK DRIVER (TRACTOR HAUL TRUCK) | $14.00 | $0.00 |
| TRUCK DRIVER (SEMI-TRAILER TRUCK) | $16.58 | $0.26 |
| POWER EQUIPMENT OPERATOR: TRACTOR | $16.84 | $0.26 |
| POWER EQUIPMENT OPERATOR: SCREED | $15.96 | $0.26 |
| POWER EQUIPMENT OPERATOR: SCRAPER | $15.91 | $0.26 |
| POWER EQUIPMENT OPERATOR: ROTOMILL | $15.80 | $0.26 |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT AND DIRT) (QUAY) | $14.74 | $0.26 |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT AND DIRT) (MCKINLEY) | $16.49 | $0.26 |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT AND DIRT) (CIBOLA, COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $14.39 | $0.98 |
| POWER EQUIPMENT OPERATOR: PILEDRIVER (QUAY) | $15.99 | $0.26 |
| POWER EQUIPMENT OPERATOR: PILEDRIVER (MCKINLEY) | $14.95 | $0.26 |
| POWER EQUIPMENT OPERATOR: PILEDRIVER (CIBOLA, COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $15.87 | $0.26 |
| POWER EQUIPMENT OPERATOR: OILER | $14.29 | $0.26 |
| POWER EQUIPMENT OPERATOR: MECHANIC | $17.48 | $0.26 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (MCKINLEY) | $16.13 | $0.26 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (HARDING) | $19.37 | $0.26 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (COLFAX) | $15.72 | $0.26 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (CIBOLA, GUADALUPE, LOS ALAMOS, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $16.27 | $0.26 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (QUAY) | $19.50 | $0.26 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (CIBOLA, COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $17.48 | $0.26 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $17.16 | $0.26 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (QUAY) | $14.89 | $0.26 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (CIBOLA, COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $14.97 | $0.26 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER | $18.06 | $0.26 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (QUAY) | $16.27 | $0.26 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (MCKINLEY) | $16.70 | $0.26 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (HARDING) | $20.74 | $0.26 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (CIBOLA, COLFAX, GUADALUPE, LOS ALAMOS, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $16.80 | $0.26 |
| POWER EQUIPMENT OPERATOR: (TRENCHER) | $16.26 | $0.26 |
| POWER EQUIPMENT OPERATOR: (MILLING MACHINE) | $16.89 | $0.26 |
| POWER EQUIPMENT OPERATOR: (DISTRIBUTOR) | $14.50 | $0.26 |
| POWER EQUIPMENT OPERATOR: (CRUSHER) | $16.53 | $0.26 |
| POWER EQUIPMENT OPERATOR: (BROOM OPERATOR) | $15.72 | $0.26 |
| POWER EQUIPMENT OPERATOR: (ASPHALT/CONCRETE PAVER, LAYDOWN MACHINE, AND PLANT) | $16.43 | $1.51 |
| PAINTER, BRUSH, ROLLER AND SPRAY (MCKINLEY) | $14.15 | $0.44 |
| PAINTER, BRUSH, ROLLER AND SPRAY (CIBOLA, COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, QUAY, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $15.06 | $0.44 |
| LABORER: PIPELAYER | $16.99 | $0.35 |
| LABORER: ASPHALT RAKER | $14.39 | $0.35 |
| LABORER, MASONTENDER-BRICK/CEMENT/CONCRETE (RIO ARRIBA) | $13.33 | $1.97 |
| LABORER, MASONTENDER-BRICK/CEMENT/CONCRETE (CIBOLA, COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, QUAY, SAN MIGUEL, TAOS, UNION) | $13.04 | $1.78 |
| LABORER, FLAGGER/CONE SETTER (QUAY) | $12.21 | $0.26 |
| LABORER, FLAGGER/CONE SETTER (MCKINLEY) | $11.66 | $0.35 |
| LABORER, FLAGGER/CONE SETTER (COLFX, GUADALUPE, HARDING, LOS ALAMOS, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $12.15 | $0.99 |
| LABORER, FLAGGER/CONE SETTER (CIBOLA) | $13.14 | $0.35 |
| LABORER, COMMON OR GENERAL (UNION) | $10.89 | $0.35 |
| LABORER, COMMON OR GENERAL (TAOS) | $12.61 | $0.35 |
| LABORER, COMMON OR GENERAL (SAN MIGUEL) | $12.56 | $0.35 |
| LABORER, COMMON OR GENERAL (RIO ARRIBA) | $12.28 | $0.35 |
| LABORER, COMMON OR GENERAL (QUAY) | $12.15 | $0.35 |
| LABORER, COMMON OR GENERAL (MORA) | $11.34 | $0.35 |
| LABORER, COMMON OR GENERAL (MCKINLEY) | $11.22 | $0.35 |
| LABORER, COMMON OR GENERAL (HARDING) | $11.57 | $0.35 |
| LABORER, COMMON OR GENERAL (GUADALUPE, LOS ALAMOS) | $11.83 | $0.35 |
| LABORER, COMMON OR GENERAL (COLFAX) | $9.60 | $0.35 |
| LABORER, COMMON OR GENERAL (CIBOLA) | $12.27 | $0.35 |
| LABORER (GRADE CHECKER) | $14.67 | $1.60 |
| IRONWORKER, STRUCTURAL | $21.77 | $6.03 |
| IRONWORKER, REINFORCING (RIO ARRIBA) | $21.98 | $6.03 |
| IRONWORKER, REINFORCING (MCKINLEY) | $22.44 | $5.85 |
| IRONWORKER, REINFORCING (COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MORA, QUAY, SAN MIGUEL, TAOS, UNION) | $21.57 | $4.80 |
| IRONWORKER, REINFORCING (CIBOLA) | $23.05 | $1.54 |
| INSTALLER: (GUARDRAILS, HANDRAILS AND SIGNS) (QUAY) | $12.00 | $0.35 |
| INSTALLER: (GUARDRAILS, HANDRAILS AND SIGNS) (GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $12.37 | $0.35 |
| INSTALLER: (GUARDRAILS, HANDRAILS AND SIGNS) (COLFAX) | $11.68 | $0.35 |
| INSTALLER: (GUARDRAILS, HANDRAILS AND SIGNS) (CIBOLA) | $12.35 | $0.35 |
| HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER (SAN MIGUEL) | $15.31 | $0.35 |
| HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER (QUAY) | $16.37 | $0.26 |
| HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER (MCKINLEY) | $14.55 | $0.35 |
| HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER (COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MORA, RIO ARRIBA, TAOS, UNION) | $15.16 | $0.35 |
| HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER (CIBOLA) | $13.66 | $0.35 |
| CEMENT MASON/CONCRETE FINISHER (TAOS) | $14.98 | $0.26 |
| CEMENT MASON/CONCRETE FINISHER (RIO ARRIBA, SAN MIGUEL) | $15.58 | $1.54 |
| CEMENT MASON/CONCRETE FINISHER (COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, QUAY, UNION) | $15.07 | $0.26 |
| CEMENT MASON/CONCRETE FINISHER (CIBOLA) | $15.58 | $0.26 |
| CARPENTER, INCLUDES FORM WORK (SAN MIGUEL) | $13.93 | $0.44 |
| CARPENTER, INCLUDES FORM WORK (MORA) | $14.44 | $0.44 |
| CARPENTER, INCLUDES FORM WORK (MCKINLEY) | $13.51 | $0.44 |
| CARPENTER, INCLUDES FORM WORK (GUADALUPE, LOS ALAMOS, COLFAX, HARDING, GUAY, TAOS, UNION) | $13.84 | $0.44 |
| CARPENTER, INCLUDES FORM WORK (CIBOLA, RIA ARRIBA) | $14.27 | $0.44 |
Related Wage Determinations
View directory →Davis-Bacon
NM20260038 (Rev 1)
New Mexico • Bernalillo
Davis-Bacon
NM20260047 (Rev 1)
New Mexico • Sandoval
Davis-Bacon
NM20260018 (Rev 1)
New Mexico • Eddy
Davis-Bacon
NM20260022 (Rev 1)
New Mexico • Los Alamos
Davis-Bacon
NM20260042 (Rev 1)
New Mexico • Santa Fe
Davis-Bacon
NM20260032 (Rev 1)
New Mexico • Hidalgo, Sierra