Skip to content
Davis-Bacon

OH20260090 (Rev 1)

Coverage: Ohio • Mahoning.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
ASBESTOS WORKER/HEAT & FROST INSULATOR$35.23$23.04
BRICKLAYER$33.48$23.51
BRICK POINTER/CAULKER/CLEANER$33.48$23.51
TILE SETTER$36.07$19.49
CARPENTER (INCLUDES DRYWALL HANGING AND METAL STUD INSTALLATION, AND EXCLUDES FORM WORK)$31.77$23.54
ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING)$41.49$21.81
FOR LESS THAN 5 YEARS' SERVICE$60.52$38.44
POWER EQUIPMENT OPERATOR: FORKLIFT$32.06$24.01
POWER EQUIPMENT OPERATOR (OILER)$28.77$24.01
POWER EQUIPMENT OPERATOR (MECHANIC)$36.92$24.01
POWER EQUIPMENT OPERATOR (BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BULLDOZER; CRANE; GRADER/BLADE; LOADER)$36.92$24.01
IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL$36.26$28.16
LABORER: COMMON OR GENERAL$31.64$12.95
LABORER (MASON TENDER - BRICK & CEMENT/CONCRETE)$31.64$12.95
LABORER (FORM WORK)$29.34$11.80
PAINTER: BRUSH AND ROLLER$30.64$18.36
PAINTER (DRYWALL FINISHING/TAPING ONLY)$31.64$18.36
GLAZIER$27.51$19.70
CEMENT MASON/CONCRETE FINISHER$29.65$18.61
PLUMBER (EXCLUDES HVAC PIPE INSTALLATION)$40.55$29.25
PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION)$40.55$29.25
ROOFER$40.15$21.28
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$38.36$29.59
SHEET METAL WORKER (EXCLUDING HVAC DUCT INSTALLATION)$38.36$29.59
TRUCK DRIVER: DUMP (ALL TYPES)$24.32$11.73
TILE FINISHER$24.24$9.75
OPERATOR: ROLLER$26.89$14.18
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$30.28$13.29
LABORER: PIPELAYER$23.98$8.58
ELECTRICIAN (LOW VOLTAGE WIRING ONLY)$20.58$0.00
PAINTER: SPRAY$25.62$13.83

Related Wage Determinations

View directory →