Davis-Bacon
OH20260100 (Rev 1)
Coverage: Ohio • Summit.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $43.88 | $26.93 |
| BRICK POINTER/CAULKER/CLEANER | $36.89 | $22.13 |
| BRICKLAYER | $36.89 | $22.13 |
| TILE FINISHER | $25.37 | $17.42 |
| TILE SETTER | $33.23 | $15.47 |
| CARPENTER (INCLUDING DRYWALL HANGING, METAL STUD INSTALLATION, AND FORM WORK) | $36.29 | $23.79 |
| PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; JULY 4TH; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY B. 1 WEEK'S PAID VACATION FOR 1 YEAR'S SERVICE; 2 WEEKS' PAID VACATION FOR 2 OR MORE YEARS' SERVICE | $46.63 | $24.92 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF HVAC/TEMPERATURE CONTROLS) | $42.55 | $23.18 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $29.23 | $16.36 |
| FOR LESS THAN 5 YEARS' SERVICE | $60.52 | $38.44 |
| POWER EQUIPMENT OPERATOR: CRANE | $46.71 | $16.41 |
| POWER EQUIPMENT OPERATOR (OILER) | $36.93 | $16.41 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $45.63 | $16.41 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $32.42 | $19.66 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $28.87 | $19.66 |
| POWER EQUIPMENT OPERATOR (MECHANIC) | $32.92 | $19.66 |
| IRONWORKER (ORNAMENTAL, REINFORCING, & STRUCTURAL) | $36.83 | $29.01 |
| LABORER (MASON TENDER - CEMENT/CONCRETE) | $31.89 | $22.66 |
| LABORER: PIPELAYER | $35.12 | $12.65 |
| LABORER: MASON TENDER - BRICK | $35.07 | $12.65 |
| LABORER: COMMON OR GENERAL | $34.92 | $12.65 |
| GLAZIER | $32.87 | $15.17 |
| PLASTERER | $29.51 | $15.67 |
| CEMENT MASON/CONCRETE FINISHER | $33.48 | $24.81 |
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION) | $49.17 | $28.55 |
| ROOFER | $40.15 | $21.28 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $37.66 | $32.23 |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT INSTALLATION) | $38.36 | $29.59 |
| TRUCK DRIVER: DUMP (ALL TYPES) | $24.32 | $11.73 |
| PLUMBER | $27.79 | $14.49 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $35.12 | $0.00 |
| PAINTER: SPRAY | $22.78 | $12.40 |
| PAINTER (BRUSH AND ROLLER) | $20.55 | $1.88 |
| OPERATOR: ROLLER | $31.48 | $12.80 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $31.48 | $12.80 |
| OPERATOR: LOADER | $29.66 | $12.61 |
| OPERATOR: BULLDOZER | $29.23 | $12.76 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $32.30 | $10.80 |