| Occupation | Base | Fringe |
|---|---|---|
| BOILERMAKER | $33.70 | $24.41 |
| BRICKLAYER | $26.92 | $13.09 |
| ELECTRICIAN (KAY AND NOBLE COUNTIES) | $41.25 | $13.30 |
| ELECTRICIAN: ALARM INSTALLATION AND LOW VOLTAGE WIRING ONLY (KAY AND NOBLE COUNTIES) | $41.25 | $13.30 |
| ELECTRICIAN (BEAVER, CIMARRON, AND TEXAS COUNTIES) | $29.41 | $12.73 |
| ELECTRICIAN: ALARM INSTALLATION AND LOW VOLTAGE WIRING ONLY (BEAVER, CIMARRON, AND TEXAS COUNTIES) | $29.41 | $12.73 |
| ELECTRICIAN (ALFALFA, BLAINE, DEWEY, ELLIS, GRANT, HARPER, KINGFISHER, MAJOR AND WOODWARD COUNTIES) | $41.40 | $13.14 |
| ELECTRICIAN: ALARM INSTALLATION AND LOW VOLTAGE WIRING ONLY (ALFALFA, BLAINE, DEWEY, ELLIS, GRANT, HARPER, KINGFISHER, MAJOR AND WOODWARD COUNTIES) | $24.26 | $9.76 |
| POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT | $28.77 | $19.05 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER | $34.07 | $19.05 |
| QUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | $35.40 | $19.05 |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY | $36.14 | $19.05 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER | $27.25 | $19.05 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $38.09 | $19.05 |
| IRONWORKER, STRUCTURAL (ALFALFA, BEAVER, BLAINE, CIMARRON, DEWEY, ELLIS, GRANT, HARPER, KINGFISHER, MAJOR, NOBLE, TEXAS, AND WOODWARD COUNTIES) | $32.10 | $17.38 |
| IRONWORKER, STRUCTURAL (KAY COUNTY) | $30.35 | $16.83 |
| PLASTERER | $33.62 | $14.18 |
| PIPEFITTER: HVAC PIPE INSTALLATION (ALFALFA, BEAVER, BLAINE, CIMARRON, DEWEY, ELLIS, GRANT, HARPER, KINGFISHER, MAJOR, NOBLE, TEXAS AND WOODWARD COUNTIES) | $41.00 | $16.03 |
| PLUMBER: EXCLUDES HVAC PIPE INSTALLATION (ALFALFA, BEAVER, BLAINE, CIMARRON, DEWEY, ELLIS, GRANT, HARPER, KINGFISHER, MAJOR, NOBLE, TEXAS AND WOODWARD COUNTIES) | $41.00 | $16.03 |
| PIPEFITTER: HVAC PIPE INSTALLATION (KAY COUNTY) | $36.65 | $16.03 |
| PLUMBER: EXCLUDES HVAC PIPE INSTALLATION (KAY COUNTY) | $36.65 | $16.03 |
| SHEET METAL WORKER (HVAC DUCT AND UNIT INSTALLATION ONLY) | $33.38 | $16.36 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $16.32 | $0.00 |
| ROOFER | $15.00 | $0.29 |
| PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION | $19.00 | $0.00 |
| PAINTER: DRYWALL FINISHING/TAPING | $12.00 | $0.00 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $12.18 | $0.00 |
| OPERATOR: ROLLER | $13.80 | $0.94 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.34 | $0.74 |
| LABORER: PLASTER TENDER | $10.17 | $0.00 |
| LABORER: PIPELAYER | $13.03 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.04 | $0.00 |
| LABORER: MASON TENDER - BRICK | $11.88 | $0.00 |
| LABORER: COMMON OR GENERAL | $9.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $16.10 | $0.00 |
| CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $15.58 | $5.50 |
| CARPENTER (FORM WORK ONLY) | $15.34 | $5.50 |
| CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $14.16 | $0.00 |
Related Wage Determinations
View directory →Davis-Bacon
OK20260024 (Rev 1)
Oklahoma • Le Flore
Davis-Bacon
OK20260032 (Rev 1)
Oklahoma • Texas
Davis-Bacon
OK20260046 (Rev 2)
Oklahoma • Lincoln
Davis-Bacon
OK20260034 (Rev 1)
Oklahoma • Alfalfa, Beaver, Blaine +12
Davis-Bacon
OK20260026 (Rev 1)
Oklahoma • Oklahoma
Davis-Bacon
OK20260044 (Rev 1)
Oklahoma • Creek