Davis-Bacon
OK20260072 (Rev 1)
Coverage: Oklahoma • Craig, Delaware, McIntosh +2.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| BOILERMAKER | $33.70 | $24.41 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS AND SOUND AND COMMUNICATION SYSTEMS) | $38.38 | $12.89 |
| FOR LESS THAN 5 YEARS' SERVICE | $51.24 | $38.44 |
| POWER EQUIPMENT OPERATOR: GROUP 8 FORKKLIFT | $28.77 | $19.05 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE;BACKHHOE; TRACKHOE; EXCAVATOR AND BULLDOZER | $34.07 | $19.05 |
| EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | $35.40 | $19.05 |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY | $36.14 | $19.05 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER | $27.25 | $19.05 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $38.09 | $19.05 |
| IRONWORKER, STRUCTURAL | $30.35 | $16.83 |
| PIPEFITTER (INCLUDING HVAC PIPE AND UNIT INSTALLATION) | $36.65 | $16.03 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $35.49 | $14.60 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $39.95 | $0.38 |
| ROOFER | $15.00 | $0.29 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $24.66 | $10.36 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $13.56 | $0.00 |
| LABORER: PIPELAYER | $12.93 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.04 | $0.00 |
| LABORER: MASON TENDER - BRICK | $10.25 | $0.00 |
| LABORER: COMMON OR GENERAL | $11.51 | $0.00 |
| ELECTRICIAN: ALARM INSTALLATION | $20.47 | $4.52 |
| ELECTRICIAN (SOUND AND COMMUNICATIONS SYSTEMS INSTALLATION) | $22.10 | $5.76 |
| ELECTRICIAN (LOW VOLTAGE WIRING) | $21.14 | $4.96 |
| CEMENT MASON/CONCRETE FINISHER | $16.91 | $0.61 |
| CAULKER | $20.00 | $1.61 |
| CARPENTER | $13.42 | $0.00 |
| BRICKLAYER | $20.00 | $0.00 |
Related Wage Determinations
View directory →Davis-Bacon
OK20260046 (Rev 2)
Oklahoma • Lincoln
Davis-Bacon
OK20260034 (Rev 1)
Oklahoma • Alfalfa, Beaver, Blaine +12
Davis-Bacon
OK20260024 (Rev 1)
Oklahoma • Le Flore
Davis-Bacon
OK20260026 (Rev 1)
Oklahoma • Oklahoma
Davis-Bacon
OK20260032 (Rev 1)
Oklahoma • Texas
Davis-Bacon
OK20260044 (Rev 1)
Oklahoma • Creek