Davis-Bacon
PA20260046 (Rev 3)
Coverage: Pennsylvania • Clarion.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (INDUSTRIAL; MECHANICAL- DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $46.50 | $29.43 |
| BOILERMAKER | $48.28 | $33.17 |
| TILE SETTER | $35.64 | $21.63 |
| TILE FINISHER | $28.76 | $17.16 |
| TO THE BASE WAGE FOR BRICK REFRACTORY WORK | $34.14 | $22.77 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION, FLOOR LAYING-HARDWOOD FLOORS, CARPET, AND VINYL) | $35.94 | $19.02 |
| MILLWRIGHT | $43.00 | $23.44 |
| CARPENTER (INCLUDES DRYWALL HANGING, METAL STUD INSTALLATION; EXCLUDES ACOUSTICAL CEILING INSTALLATION, FLOOR LAYING- HARDWOOD, CARPET, AND VINYL AND SCAFFOLD BUILDING) | $33.01 | $18.09 |
| CARPENTER (SCAFFOLD BUILDING ONLY) | $35.94 | $19.02 |
| ELECTRICIAN (INCLUDES INSTALLATION OF SOUND AND COMMUNICATION SYSTEM AND LOW VOLTAGE WIRING; EXCLUDES HVAC TEMPERATURE CONTROL INSTALLATION AND ALARM INSTALLATION) | $49.11 | $36.79 |
| ELECTRICIAN (ALARM INSTALLATION ONLY) | $51.45 | $29.77 |
| POWER EQUIPMENT OPERATOR: ROLLER, FORKLIFT (RIDDEN OR SELF-PROPELLED) | $32.25 | $21.32 |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | $21.32 |
| POWER EQUIPMENT OPERATOR: BULLDOZER, PAVER (ASPHALT, AGGREGATE, AND CONCRETE), FORKLIFT (LULL), MAN LIFT/OUTSIDE ELEVATOR | $36.87 | $21.32 |
| IRONWORKER, STRUCTURAL | $38.89 | $34.54 |
| IRONWORKER (REINFORCING AND METAL ROOF INSTALLATION ONLY) | $36.26 | $28.16 |
| LABORER (COMMON OR GENERAL; CONCRETE WORKER) | $26.82 | $19.39 |
| PAINTER (SPRAY ONLY, EXCLUDES WORK ON INDUSTRIAL SITES) | $27.95 | $16.12 |
| PAINTER: DRYWALL FINISHING/TAPING ONLY | $32.39 | $23.26 |
| PAINTER: BRUSH AND ROLLER ONLY | $30.56 | $23.72 |
| PAINTER (INDUSTRIAL: SPRAY ONLY) | $36.01 | $23.72 |
| GLAZIER | $25.40 | $25.47 |
| CEMENT MASON/CONCRETE FINISHER | $31.77 | $21.89 |
| PLASTERER | $30.69 | $18.99 |
| PIPEFITTER (INDUSTRIAL) | $47.75 | $26.55 |
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION AND WORK ON INDUSTRIAL SITES) | $40.02 | $26.55 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $48.15 | $29.17 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $49.75 | $30.26 |
| TRUCK DRIVER: DUMP TRUCK | $24.98 | $11.88 |
| SHEET METAL WORKER (METAL FLASHING INSTALLATION ONLY) | $31.43 | $20.05 |
| ROOFER, EXCLUDES INSTALLATION OF METAL ROOFS | $24.13 | $11.95 |
| PLUMBER | $31.72 | $17.01 |
| MECHANICAL INSULATOR, INCLUDING DUCT AND PIPE AND EXCLUDING WORK ON INDUSTRIAL SITES | $30.60 | $17.16 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $18.41 | $6.45 |
| ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) | $29.05 | $16.89 |
| CARPENTER (FORM WORK ONLY) | $26.36 | $9.97 |
| LABORER: MASON TENDER - BRICK | $23.23 | $18.53 |
| OPERATOR: MECHANIC | $36.53 | $22.01 |
| IRONWORKER: ORNAMENTAL | $34.91 | $30.85 |
| IRONWORKER, RIGGER | $35.22 | $30.56 |
| OPERATOR: HIGHLIFT | $31.19 | $22.01 |
Related Wage Determinations
View directory →Davis-Bacon
PA20260041 (Rev 2)
Pennsylvania • Mercer
Davis-Bacon
PA20260090 (Rev 3)
Pennsylvania • Franklin
Davis-Bacon
PA20260091 (Rev 3)
Pennsylvania • Lackawanna
Davis-Bacon
PA20260020 (Rev 4)
Pennsylvania • Allegheny, Armstrong, Beaver +30
Davis-Bacon
PA20260062 (Rev 2)
Pennsylvania • Potter
Davis-Bacon
PA20260080 (Rev 3)
Pennsylvania • Cambria