Skip to content
Davis-Bacon

PA20260061 (Rev 1)

Coverage: Pennsylvania • Northumberland.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL- DUCT, PIPE & MECHANICAL SYSTEM INSULATION)$39.18$26.07
BOILERMAKER$48.28$33.17
MASON - STONE$32.66$21.58
BRICKLAYER (INCLUDING POINTING, CAULKING, AND CLEANING)$32.66$21.58
TERRAZZO WORKER/SETTER$33.83$20.78
TERRAZZO WORKER/GRINDER$33.94$19.03
TERRAZZO FINISHER$33.23$19.03
TILE SETTER$35.64$21.63
TILE FINISHER$28.76$17.16
CARPENTER (INCLUDES DRYWALL HANGING, METAL STUD INSTALLATION, FORM WORK AND SCAFFOLD BUILDING; EXCLUDES ACOUSTICAL CEILING INSTALLATION)$36.84$20.19
MILLWRIGHT$43.00$23.44
ELECTRICIAN (EXCLUDES ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEMS, AND LOW VOLTAGE WIRING)$41.00$31.06
ELECTRICIAN (ALARM INSTALLATION, INSTALLATION OF COMMUNICATION AND SOUND SYSTEMS ONLY)$34.77$20.19
DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY$61.41$38.44
POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE AND CONCRETE)$36.87$21.32
POWER EQUIPMENT OPERATOR: CRANE$47.14$31.58
POWER EQUIPMENT OPERATOR (FORKLIFT (UNDER 20 FT.))$41.88$30.03
POWER EQUIPMENT OPERATOR (BULLDOZER, LOADER, BACKHOE/EXCAVATOR/TRACKHOE, FORKLIFT (20 FT. AND OVER))$44.61$30.83
IRONWORKER (STRUCTURAL AND REINFORCING)$37.26$32.63
LABORER (VIBRATING PLATE)$21.57$15.04
LABORER (FORKLIFT (MASONRY WORK ONLY))$25.29$15.04
PAINTER: BRUSH, ROLLER, AND SPRAY$27.95$16.12
PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION)$41.36$29.45
SHEET METAL WORKER: EXCLUDING HVAC DUCT INSTALLATION FOOTNOTE: PAID HOLIDAY: ELECTION DAY$43.09$42.52
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$36.13$30.32
TRUCK DRIVER: DUMP TRUCK$24.98$11.88
ROOFER$33.50$22.10
PLUMBER, EXCLUDES HVAC UNIT INSTALLATION$29.28$13.45
PLUMBER (HVAC UNIT INSTALLATION ONLY)$24.31$3.95
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$26.96$13.93
LABORER: MASON TENDER - CEMENT/CONCRETE$16.09$3.44
LABORER: COMMON OR GENERAL$19.84$9.22
HVAC MECHANIC (HVAC TEMPERATURE CONTROLS INSTALLATION ONLY)$17.00$2.35
ELECTRICIAN (LOW VOLTAGE WIRING ONLY)$15.00$2.21
CEMENT MASON/CONCRETE FINISHER$19.81$9.03
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY)$25.71$12.02
OPERATOR: MECHANIC$36.53$22.01
IRONWORKER: ORNAMENTAL$34.65$31.12
LABORER: MASON TENDER - BRICK$22.29$15.92
OPERATOR: OILER$37.10$27.62

Related Wage Determinations

View directory →