Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) (ASBESTOS ABATEMENT, REMOVAL FROM MECHANICAL SYSTEMS ONLY)$40.00$29.81
BOILERMAKER$55.00$35.48
PILEDRIVERMAN$36.87$20.49
CARPENTER (SCAFFOLD BUILDING AND FORM WORK ONLY)$36.84$20.19
MILLWRIGHT$43.00$23.44
ELECTRICIAN (INCLUDES HVAC/TEMPERATURE CONTROLS INSTALLATION, AND LOW VOLTAGE WIRING; EXCLUDES INSTALLATION OF SOUND AND COMMUNICATION SYSTEMS AND ALARM INSTALLATION)$40.00$27.42
ELECTRICIAN (ALARM INSTALLATION ONLY)$40.31$23.93
ELECTRICIAN (INSTALLATION OF COMMUNICATION AND SOUND SYSTEMS ONLY)$34.77$20.19
DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY$58.70$38.44
POWER EQUIPMENT OPERATOR (PUMP)$32.25$21.32
POWER EQUIPMENT OPERATOR (MECHANIC)$36.87$21.32
POWER EQUIPMENT OPERATOR: CRANE$47.14$31.58
POWER EQUIPMENT OPERATOR (OILER)$39.42$29.30
POWER EQUIPMENT OPERATOR (HOIST (WITH TWO TOWERS), FORKLIFT (20 FT AND OVER, EXCLUDES MASONRY WORK))$44.61$30.83
POWER EQUIPMENT OPERATOR (HOIST (SINGLE DRUM), FORKLIFT (UNDER 20 FT., EXCLUDES MASONRY WORK))$41.88$30.03
IRONWORKER: ORNAMENTAL AND STRUCTURAL$37.26$32.63
LABORER (ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, AND CEILINGS))$27.47$19.89
LABORER (JACK HAMMER; MASON TENDER-BRICK)$27.02$19.48
LABORER (FORKLIFT (MASONRY WORK ONLY))$28.52$19.48
LABORER (CONCRETE WORKER; CONCRETE SAW (WALK BEHIND/HAND HELD))$25.01$19.48
PAINTER (SPRAY ONLY)$26.98$15.65
PAINTER: BRUSH AND ROLLER ONLY$25.84$16.30
PLUMBER$41.36$29.45
PIPEFITTER (INCLUDES HVAC UNIT INSTALLATION, EXCLUDES HVAC PIPE INSTALLATION)$41.36$29.45
SPRINKLER FITTER (FIRE SPRINKLERS)$49.75$28.96
SHEET METAL WORKER: EXCLUDING HVAC DUCT INSTALLATION FOOTNOTE: PAID HOLIDAY: ELECTION DAY$43.09$42.52
TRUCK DRIVER: DUMP TRUCK$19.77$5.02
TILE SETTER$24.31$11.62
TILE FINISHER$20.65$8.24
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$29.56$19.21
ROOFER: WATERPROOFING ONLY$28.60$18.02
ROOFER, EXCLUDES WATERPROOFING$17.00$2.78
PIPEFITTER (HVAC PIPE INSTALLATION ONLY)$47.38$6.89
OPERATOR: ROLLER$30.39$13.72
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$30.39$15.05
OPERATOR: LOADER$27.05$14.52
OPERATOR: GRADER/BLADE$32.51$17.98
OPERATOR: GRADALL$32.70$18.43
OPERATOR: DRILL$25.58$17.07
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$24.14$13.55
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$31.05$10.85
LABORER: MASON TENDER - CEMENT/CONCRETE$26.17$4.88
LABORER: LANDSCAPE$15.01$0.00
LABORER: COMMON OR GENERAL$19.70$7.14
IRONWORKER, REINFORCING$28.97$6.47
GLAZIER$20.19$6.92
FLOOR LAYER: VINYL FLOORING ONLY$19.71$5.94
FLOOR LAYER: HARDWOOD FLOORS ONLY$26.91$11.88
FLOOR LAYER: CARPET ONLY$18.78$5.02
CEMENT MASON/CONCRETE FINISHER$27.76$8.21
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND METAL STUD INSTALLATION, FORM WORK, AND SCAFFOLD BUILDING$25.93$11.29
CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY)$24.18$12.02
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY)$37.73$4.59
BRICKLAYER, INCLUDES POINTING, CAULKING, AND CLEANING$28.56$11.56
OPERATOR: BULLDOZER$37.85$22.72