Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $40.00 | $29.81 |
| BOILERMAKER | $55.00 | $35.48 |
| MASON - STONE | $33.24 | $17.78 |
| BRICKLAYER (INCLUDING POINTING, CAULKING, AND CLEANING) | $33.24 | $17.78 |
| TILE SETTER | $31.12 | $21.11 |
| TILE FINISHER | $30.20 | $16.41 |
| K, METAL FLASHING INSTALLATION, METAL ROOF INSTALLATION, SCAFFOLD BUILDING (EXCLUDING MASONRY/BRICK), SIDING INSTALLATION- METAL, ALUMINUM AND VINYL; EXCLUDING FLOOR LAYING- HARDWOOD, CARPET AND VINYL) | $39.74 | $28.09 |
| MILLWRIGHT | $51.22 | $36.72 |
| CARPENTER (FLOOR LAYING- HARDWOOD, CARPET AND VINYL ONLY) | $41.23 | $29.79 |
| ELECTRICIAN (INCLUDES ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEMS, LOW VOLTAGE WIRING, AND SOLAR PANEL WIRING AND INSTALLATION) | $50.00 | $25.93 |
| DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY | $61.41 | $38.44 |
| POWER EQUIPMENT OPERATOR (PUMP) | $28.36 | $18.10 |
| POWER EQUIPMENT OPERATOR: ROLLER | $31.09 | $22.35 |
| POWER EQUIPMENT OPERATOR: CRANE | $37.49 | $24.23 |
| POWER EQUIPMENT OPERATOR (OILER) | $29.77 | $21.95 |
| POWER EQUIPMENT OPERATOR (HOIST (SINGLE DRUM), FORKLIFT (UNDER 20 FT, EXCLUDES MASONRY WORK)) | $32.23 | $22.68 |
| POWER EQUIPMENT OPERATOR (COMPRESSOR) | $31.09 | $22.35 |
| SKID LOADER,BOOM, BULLDOZER, CONCRETE PUMP, HOIST (WITH TWO TOWERS), MECHANIC, ROLLER (HIGH GRADE FINISHING), DRILL RIG CAISSONS, HEAT PLANER, LOADER, FORKLIFT (20 FT. AND OVER, EXCLUDES MASONRY WORK)) | $34.96 | $23.48 |
| IRONWORKER: ORNAMENTAL | $37.26 | $32.63 |
| LABORER (PLASTER TENDER) | $26.74 | $17.34 |
| LABORER (FORKLIFT (MASONRY WORK ONLY); SCAFFOLD BUILDER (BRICK AND MASONRY); MASON TENDER-BRICK) | $26.74 | $17.34 |
| LABORER (CONCRETE WORKER; TAMPER (HAND HELD)) | $25.39 | $17.34 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $26.45 | $16.30 |
| PAINTER (DRYWALL FINISHING/TAPING ONLY) | $27.01 | $16.30 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | $59.65 | $42.78 |
| PLUMBER | $56.28 | $35.51 |
| ROOFER (EXCLUDES METAL ROOF INSTALLATION AND WATERPROOFING) | $40.33 | $32.62 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $49.75 | $30.26 |
| SHEET METAL WORKER: INCLUDES HVAC DUCT INSTALLATION FOOTNOTE: PAID HOLIDAY: ELECTION DAY | $43.09 | $42.52 |
| TRUCK DRIVER: DUMP TRUCK | $23.36 | $7.60 |
| ROOFER: WATERPROOFING ONLY | $28.60 | $18.02 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $33.01 | $18.37 |
| OPERATOR: GRADER/BLADE | $32.51 | $17.98 |
| OPERATOR: GRADALL | $32.70 | $18.43 |
| OPERATOR: DRILL | $28.55 | $15.78 |
| LABORER: COMMON OR GENERAL | $23.72 | $12.47 |
| IRONWORKER, STRUCTURAL | $33.55 | $23.11 |
| IRONWORKER, REINFORCING | $26.24 | $14.49 |
| GLAZIER | $29.22 | $15.73 |
| CEMENT MASON/CONCRETE FINISHER | $24.55 | $15.38 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $27.89 | $19.81 |
| HVAC MECHANIC (HVAC TEMPERATURE CONTROLS INSTALLATION ONLY) | $53.09 | $34.80 |
Related Wage Determinations
View directory →Davis-Bacon
PA20260062 (Rev 2)
Pennsylvania • Potter
Davis-Bacon
PA20260111 (Rev 1)
Pennsylvania • Montour
Davis-Bacon
PA20260020 (Rev 4)
Pennsylvania • Allegheny, Armstrong, Beaver +30
Davis-Bacon
PA20260091 (Rev 3)
Pennsylvania • Lackawanna
Davis-Bacon
PA20260041 (Rev 2)
Pennsylvania • Mercer
Davis-Bacon
PA20260090 (Rev 3)
Pennsylvania • Franklin