Skip to content
Davis-Bacon

PA20260100 (Rev 3)

Coverage: Pennsylvania • Montour.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL- DUCT, PIPE & MECHANICAL SYSTEM INSULATION)$39.18$26.07
BOILERMAKER$55.00$35.48
MASON - STONE$32.66$21.58
BRICKLAYER (INCLUDING POINTING, CAULKING, AND CLEANING)$32.66$21.58
TILE FINISHER$27.63$13.94
TILE SETTER$32.85$17.56
CARPENTER (ACOUSTICAL CEILING INSTALLER ONLY)$36.84$20.19
CARPENTER (INCLUDES DRYWALL HANGING, METAL STUD INSTALLATION, FORM WORK AND SCAFFOLD BUILDING; EXCLUDES ACOUSTICAL CEILING INSTALLATION)$36.84$20.19
MILLWRIGHT$43.00$23.44
ELECTRICIAN (ALARM INSTALLATION, HVAC/TEMPERATURE CONTROLS INSTALLATION AND LOW VOLTAGE WIRING ONLY)$41.00$31.06
DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY$58.70$38.44
POWER EQUIPMENT OPERATOR (PUMP)$28.36$18.10
POWER EQUIPMENT OPERATOR: CRANE$47.14$31.58
POWER EQUIPMENT OPERATOR (OILER)$39.42$29.30
POWER EQUIPMENT OPERATOR (HOIST (SINGLE DRUM), FORKLIFT (UNDER 20 FT ,EXCLUDES MASONRY WORK))$41.88$30.03
POWER EQUIPMENT OPERATOR (BACKHOE/ EXCAVATOR/ TRACKHOE, BOBCAT/ SKID/ STEER/ SKID LOADER, BULLDOZER, HOIST (WITH TWO TOWERS), MECHANIC, LOADER, FORKLIFT (20 FT AND OVER, EXCLUDES MASONRY WORK))$44.61$30.83
IRONWORKER, STRUCTURAL$37.26$32.63
IRONWORKER (ORNAMENTAL & REINFORCING)$37.26$32.63
LABORER: MASON TENDER-BRICK$26.91$17.18
LABORER (FORKLIFT (MASONRY WORK ONLY))$28.41$17.18
LABORER (COMMON OR GENERAL; CONCRETE SAW (WALK BEHIND/HAND HELD))$22.61$17.18
PAINTER (BRUSH, ROLLER, SPRAY, AND DRYWALL FINISHING/TAPING)$27.95$16.12
PLUMBER$41.36$29.45
PIPEFITTER (INCLUDES HVAC PIPE AND HVAC UNIT INSTALLATION)$41.36$29.45
PLUMBER$51.69$27.07
ROOFER (EXCLUDES WATERPROOFING)$40.33$32.62
SPRINKLER FITTER (FIRE SPRINKLERS)$49.75$30.26
SHEET METAL WORKER (INCLUDES HVAC DUCT AND SIDING INSTALLATION - METAL/ALUMINUM/VINYL)$36.13$30.32
TRUCK DRIVER: DUMP TRUCK$23.36$7.60
ROOFER: WATERPROOFING ONLY$28.60$18.02
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$33.01$18.37
OPERATOR: GRADER/BLADE$32.51$17.98
OPERATOR: GRADALL$32.70$18.43
OPERATOR: DRILL$28.55$15.78
LABORER: MASON TENDER - CEMENT/CONCRETE$27.89$19.81
CEMENT MASON/CONCRETE FINISHER$32.66$21.32

Related Wage Determinations

View directory →