Davis-Bacon
TX20260031 (Rev 1)
Coverage: Texas • Harris.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| SPRINKLER FITTER (FIRE SPRINKLERS) | $36.15 | $24.47 |
| TRUCK DRIVER | $12.02 | $1.02 |
| POWER EQUIPMENT OPERATOR: TRACTOR | $15.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GRADER | $12.20 | $1.48 |
| POWER EQUIPMENT OPERATOR: FRONT END LOADER | $12.16 | $0.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE | $13.47 | $0.00 |
| POWER EQUIPMENT OPERATOR: (EXCAVATOR) | $16.37 | $0.00 |
| POWER EQUIPMENT OPERATOR: (CRANE) | $15.33 | $0.57 |
| POWER EQUIPMENT OPERATOR: (BULLDOZER) | $12.58 | $0.00 |
| PIPEFITTER | $17.00 | $0.04 |
| LABORERS: MASON TENDER CEMENT | $9.94 | $0.00 |
| LABORERS: LANDSCAPE | $7.35 | $0.00 |
| LABORERS: (PIPELAYER) | $10.14 | $0.00 |
| LABORERS: (COMMON) | $8.94 | $0.00 |
| IRONWORKER: REINFORCING | $11.28 | $0.00 |
| FORMBUILDER/FORMSETTER | $13.84 | $1.17 |
| ELECTRICIAN | $17.00 | $0.04 |
| CEMENT MASON/CONCRETE FINISHER | $12.50 | $1.17 |
| CARPENTER | $14.04 | $0.00 |