Skip to content
Davis-Bacon

TX20260062 (Rev 1)

Coverage: Texas • Galveston.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
SPRINKLER FITTER (FIRE SPRINKLERS)$36.15$24.47
TRUCK DRIVER (HEAVY INCLUDING WATER AND SEWER LINES (EXCLUDING FLOOD CONTROL))$12.28$0.98
POWER EQUIPMENT OPERATORS: TRACTOR$12.38$1.51
POWER EQUIPMENT OPERATORS: GRADER$12.20$1.48
POWER EQUIPMENT OPERATORS: FRONT END LOADER$11.75$0.92
POWER EQUIPMENT OPERATORS: EXCAVATOR$16.74$0.00
POWER EQUIPMENT OPERATORS: CRANE$14.91$0.58
POWER EQUIPMENT OPERATORS: BULLDOZER$14.00$0.00
POWER EQUIPMENT OPERATORS: BACKHOE$13.25$0.00
PIPEFITTER (HEAVY INCLUDING WATER AND SEWER LINES (EXCLUDING FLOOD CONTROL))$17.00$0.04
LABORERS: PIPELAYER$10.07$0.00
LABORERS: MASON TENDER CEMENT$9.96$0.00
LABORERS: LANDSCAPE$7.35$0.00
LABORERS: COMMON$10.70$0.00
IRONWORKER, REINFORCING (HEAVY INCLUDING WATER AND SEWER LINES (EXCLUDING FLOOD CONTROL))$11.29$0.00
FORM BUILDER/FORM SETTER (HEAVY INCLUDING WATER AND SEWER LINES (EXCLUDING FLOOD CONTROL))$13.35$1.17
ELECTRICIAN (HEAVY INCLUDING WATER AND SEWER LINES (EXCLUDING FLOOD CONTROL))$18.40$1.34
CEMENT MASON/CONCRETE FINISHER (HEAVY INCLUDING WATER AND SEWER LINES (EXCLUDING FLOOD CONTROL))$11.37$1.13
CARPENTER (HEAVY INCLUDING WATER AND SEWER LINES (EXCLUDING FLOOD CONTROL))$14.38$0.00

Related Wage Determinations

View directory →