Davis-Bacon
TX20260062 (Rev 1)
Coverage: Texas • Galveston.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| SPRINKLER FITTER (FIRE SPRINKLERS) | $36.15 | $24.47 |
| TRUCK DRIVER (HEAVY INCLUDING WATER AND SEWER LINES (EXCLUDING FLOOD CONTROL)) | $12.28 | $0.98 |
| POWER EQUIPMENT OPERATORS: TRACTOR | $12.38 | $1.51 |
| POWER EQUIPMENT OPERATORS: GRADER | $12.20 | $1.48 |
| POWER EQUIPMENT OPERATORS: FRONT END LOADER | $11.75 | $0.92 |
| POWER EQUIPMENT OPERATORS: EXCAVATOR | $16.74 | $0.00 |
| POWER EQUIPMENT OPERATORS: CRANE | $14.91 | $0.58 |
| POWER EQUIPMENT OPERATORS: BULLDOZER | $14.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: BACKHOE | $13.25 | $0.00 |
| PIPEFITTER (HEAVY INCLUDING WATER AND SEWER LINES (EXCLUDING FLOOD CONTROL)) | $17.00 | $0.04 |
| LABORERS: PIPELAYER | $10.07 | $0.00 |
| LABORERS: MASON TENDER CEMENT | $9.96 | $0.00 |
| LABORERS: LANDSCAPE | $7.35 | $0.00 |
| LABORERS: COMMON | $10.70 | $0.00 |
| IRONWORKER, REINFORCING (HEAVY INCLUDING WATER AND SEWER LINES (EXCLUDING FLOOD CONTROL)) | $11.29 | $0.00 |
| FORM BUILDER/FORM SETTER (HEAVY INCLUDING WATER AND SEWER LINES (EXCLUDING FLOOD CONTROL)) | $13.35 | $1.17 |
| ELECTRICIAN (HEAVY INCLUDING WATER AND SEWER LINES (EXCLUDING FLOOD CONTROL)) | $18.40 | $1.34 |
| CEMENT MASON/CONCRETE FINISHER (HEAVY INCLUDING WATER AND SEWER LINES (EXCLUDING FLOOD CONTROL)) | $11.37 | $1.13 |
| CARPENTER (HEAVY INCLUDING WATER AND SEWER LINES (EXCLUDING FLOOD CONTROL)) | $14.38 | $0.00 |