Skip to content
Davis-Bacon

TX20260231 (Rev 1)

Coverage: Texas • Bexar.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
ASBESTOS WORKER/HEAT & FROST INSULATOR (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION)$29.50$8.79
BOILERMAKER$33.17$24.92
ELECTRICIAN (COMMUNICATION TECHNICIAN ONLY)$37.45$12.19
ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING)$37.45$12.19
SED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; FRIDAY AFTER THANKSGIVING DAY; CHRISTMAS DAY; AND VETERANS DAY$53.40$38.98
POWER EQUIPMENT OPERATOR (CRANES)$39.47$10.39
IRONWORKER, STRUCTURAL$27.95$8.03
IRONWORKER: ORNAMENTAL$28.26$8.13
PLUMBER (EXCLUDES HVAC PIPE INSTALLATION)$38.97$11.48
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION$38.97$11.48
HVAC MECHANIC (ELECTRICAL TEMPERATURE CONTROL INSTALLATION & UNIT INSTALLATION ONLY)$38.97$11.48
SPRINKLER FITTER (FIRE SPRINKLERS)$38.57$24.47
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$34.10$16.10
SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION)$34.10$16.10
TRUCK DRIVER: WATER TRUCK$12.00$4.11
TRUCK DRIVER: SEMI-TRAILER TRUCK$12.50$0.00
TRUCK DRIVER: FLATBED TRUCK$19.65$8.57
TRUCK DRIVER: DUMP TRUCK$12.39$1.18
TILE SETTER$14.94$0.00
TILE FINISHER$11.32$0.00
ROOFER$12.00$0.00
PAINTER (BRUSH, ROLLER AND SPRAY), EXCLUDES DRYWALL FINISHING/TAPING$13.07$0.00
OPERATOR: ROLLER$12.00$0.00
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$16.03$0.00
OPERATOR: MECHANIC$18.75$5.12
OPERATOR: LOADER$12.79$0.00
OPERATOR: GRADER/BLADE$23.00$5.07
OPERATOR: FORKLIFT$12.50$0.00
OPERATOR: DRILL$14.50$0.00
OPERATOR: BULLDOZER$14.00$0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$14.00$0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$15.98$0.00
LABORER: LANDSCAPE AND IRRIGATION$8.00$0.00
LABORER: ROOF TEAROFF$11.28$0.00
LABORER: PIPELAYER$11.00$0.00
LABORER: MASON TENDER - CEMENT/CONCRETE$12.00$0.00
LABORER: MASON TENDER - BRICK$11.88$0.00
LABORER: COMMON OR GENERAL$10.75$0.00
IRONWORKER, REINFORCING$12.27$0.00
ELECTRICIAN (LOW VOLTAGE WIRING ONLY)$20.39$3.04
DRYWALL HANGER AND METAL STUD INSTALLER$15.18$0.00
DRYWALL FINISHER/TAPER$13.81$0.00
CEMENT MASON/CONCRETE FINISHER$22.27$5.30
CAULKER$15.00$0.00
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION$16.86$4.17
CARPENTER (FORM WORK ONLY)$13.63$0.00
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY)$17.83$0.00
BRICKLAYER$22.15$0.00

Related Wage Determinations

View directory →