Davis-Bacon
TX20260231 (Rev 1)
Coverage: Texas • Bexar.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $29.50 | $8.79 |
| BOILERMAKER | $33.17 | $24.92 |
| ELECTRICIAN (COMMUNICATION TECHNICIAN ONLY) | $37.45 | $12.19 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $37.45 | $12.19 |
| SED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; FRIDAY AFTER THANKSGIVING DAY; CHRISTMAS DAY; AND VETERANS DAY | $53.40 | $38.98 |
| POWER EQUIPMENT OPERATOR (CRANES) | $39.47 | $10.39 |
| IRONWORKER, STRUCTURAL | $27.95 | $8.03 |
| IRONWORKER: ORNAMENTAL | $28.26 | $8.13 |
| PLUMBER (EXCLUDES HVAC PIPE INSTALLATION) | $38.97 | $11.48 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | $38.97 | $11.48 |
| HVAC MECHANIC (ELECTRICAL TEMPERATURE CONTROL INSTALLATION & UNIT INSTALLATION ONLY) | $38.97 | $11.48 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $38.57 | $24.47 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $34.10 | $16.10 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | $34.10 | $16.10 |
| TRUCK DRIVER: WATER TRUCK | $12.00 | $4.11 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | $12.50 | $0.00 |
| TRUCK DRIVER: FLATBED TRUCK | $19.65 | $8.57 |
| TRUCK DRIVER: DUMP TRUCK | $12.39 | $1.18 |
| TILE SETTER | $14.94 | $0.00 |
| TILE FINISHER | $11.32 | $0.00 |
| ROOFER | $12.00 | $0.00 |
| PAINTER (BRUSH, ROLLER AND SPRAY), EXCLUDES DRYWALL FINISHING/TAPING | $13.07 | $0.00 |
| OPERATOR: ROLLER | $12.00 | $0.00 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $16.03 | $0.00 |
| OPERATOR: MECHANIC | $18.75 | $5.12 |
| OPERATOR: LOADER | $12.79 | $0.00 |
| OPERATOR: GRADER/BLADE | $23.00 | $5.07 |
| OPERATOR: FORKLIFT | $12.50 | $0.00 |
| OPERATOR: DRILL | $14.50 | $0.00 |
| OPERATOR: BULLDOZER | $14.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $14.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $15.98 | $0.00 |
| LABORER: LANDSCAPE AND IRRIGATION | $8.00 | $0.00 |
| LABORER: ROOF TEAROFF | $11.28 | $0.00 |
| LABORER: PIPELAYER | $11.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $12.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $11.88 | $0.00 |
| LABORER: COMMON OR GENERAL | $10.75 | $0.00 |
| IRONWORKER, REINFORCING | $12.27 | $0.00 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $20.39 | $3.04 |
| DRYWALL HANGER AND METAL STUD INSTALLER | $15.18 | $0.00 |
| DRYWALL FINISHER/TAPER | $13.81 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $22.27 | $5.30 |
| CAULKER | $15.00 | $0.00 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $16.86 | $4.17 |
| CARPENTER (FORM WORK ONLY) | $13.63 | $0.00 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $17.83 | $0.00 |
| BRICKLAYER | $22.15 | $0.00 |