Davis-Bacon
TX20260296 (Rev 1)
Coverage: Texas • Aransas, Calhoun, Goliad +3.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| WORK ZONE BARRICADE SERVICER | $17.52 | $0.00 |
| TRUCK DRIVER, SINGLE OR TANDEM AXLE DUMP TRUCK | $20.30 | $0.00 |
| TRUCK DRIVER, SINGLE AXLE | $17.99 | $0.00 |
| TRUCK DRIVER LOWBOY FLOAT | $22.90 | $0.00 |
| SPREADER BOX OPERATOR | $20.63 | $0.00 |
| ROLLER OPERATOR, OTHER | $16.90 | $0.00 |
| ROLLER OPERATOR, ASPHALT | $17.27 | $0.00 |
| REINFORCING STEEL WORKER | $22.76 | $0.00 |
| RECLAIMER/PULVERIZER OPERATOR | $18.83 | $0.00 |
| PIPELAYER | $19.40 | $0.00 |
| PAINTER, STRUCTURES | $27.93 | $0.00 |
| MOTOR GRADER OPERATOR, ROUGH | $23.06 | $0.00 |
| MOTOR GRADER OPERATOR, FINE GRADE | $26.88 | $0.00 |
| MILLING MACHINE OPERATOR | $22.53 | $0.00 |
| MECHANIC | $25.51 | $0.00 |
| LOADER/BACKHOE OPERATOR | $19.01 | $0.00 |
| LABORER, UTILITY | $18.42 | $0.00 |
| LABORER, COMMON | $16.63 | $0.00 |
| FRONT END LOADER OPERATOR, OVER 3 CY | $18.71 | $0.00 |
| FRONT END LOADER OPERATOR, 3 CY OR LESS | $18.80 | $0.00 |
| FORM SETTER, PAVING & CURB | $18.16 | $0.00 |
| FORM BUILDER/SETTER, STRUCTURES | $19.82 | $0.00 |
| FLAGGER | $14.59 | $0.00 |
| EXCAVATOR OPERATOR, OVER 50,000 POUNDS | $22.05 | $0.00 |
| EXCAVATOR OPERATOR, 50,000 POUNDS OR LESS | $19.69 | $0.00 |
| CRAWLER TRACTOR OPERATOR | $23.23 | $0.00 |
| CRANE OPERATOR, LATTICE BOOM OVER 80 TONS | $34.20 | $0.00 |
| CRANE OPERATOR, HYDRAULIC OVER 80 TONS | $30.25 | $0.00 |
| CRANE OPERATOR, HYDRAULIC 80 TONS OR LESS | $27.88 | $0.00 |
| CONCRETE FINISHER, PAVING AND STRUCTURES | $21.16 | $0.00 |
| BROOM OR SWEEPER OPERATOR | $16.63 | $0.00 |
| ASPHALT RAKER | $17.40 | $0.00 |
| ASPHALT PAVING MACHINE OPERATOR | $19.14 | $0.00 |
| ASPHALT DISTRIBUTOR OPERATOR | $23.20 | $0.00 |