Davis-Bacon
UT20260104 (Rev 1)
Coverage: Utah • Box Elder.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| TRUCK DRIVER: WATER TRUCK | $24.90 | $11.70 |
| TRUCK DRIVER: VACTOR | $23.40 | $0.00 |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | $26.25 | $12.86 |
| TRUCK DRIVER: DUMP TRUCK | $24.16 | $11.77 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $20.59 | $7.56 |
| TRAFFIC CONTROL: FLAGGER | $20.59 | $8.65 |
| OPERATOR: PAVEMENT MARKING GRINDER | $24.37 | $15.65 |
| OPERATOR: SCREED | $24.45 | $15.65 |
| OPERATOR: ROLLER | $23.63 | $15.65 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.40 | $15.65 |
| OPERATOR: OILER | $22.18 | $9.73 |
| OPERATOR: MILLING MACHINE | $23.58 | $15.65 |
| OPERATOR: MECHANIC | $30.40 | $15.65 |
| OPERATOR: LOADER | $23.78 | $15.65 |
| OPERATOR: GRADER/BLADE | $27.87 | $15.65 |
| OPERATOR: DRILL | $27.44 | $15.65 |
| OPERATOR: CRANE | $30.66 | $10.61 |
| OPERATOR: CONCRETE FINISHING MACHINE | $20.03 | $6.55 |
| OPERATOR: BROOM/SWEEPER | $24.12 | $5.52 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $19.76 | $3.31 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.08 | $7.77 |
| LABORER: GRADE CHECKER | $21.21 | $6.30 |
| LABORER: PIPELAYER | $17.13 | $3.54 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $17.36 | $2.53 |
| LABORER: LANDSCAPE | $14.76 | $2.53 |
| LABORER: COMMON OR GENERAL | $20.18 | $7.35 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $21.97 | $8.65 |
| IRONWORKER, REINFORCING | $26.61 | $13.76 |
| INSTALLER - SIGN | $16.95 | $5.87 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $14.05 | $1.62 |
| FENCE ERECTOR | $15.07 | $2.53 |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING | $32.24 | $7.85 |
| CEMENT MASON/CONCRETE FINISHER | $21.19 | $6.82 |
| CARPENTER, INCLUDES FORM WORK | $22.84 | $4.64 |