Davis-Bacon
VA20260036 (Rev 1)
Coverage: Virginia • Cumberland.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| POWER EQUIPMENT OPERATORS: EXCAVATOR | $39.99 | $18.05 |
| POWER EQUIPMENT OPERATORS: BULLDOZER | $38.79 | $18.05 |
| TRUCK DRIVER, INCLUDES ALL DUMP TRUCKS | $13.59 | $3.42 |
| POWER EQUIPMENT OPERATOR: TUGBOAT | $19.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: TRACKHOE | $12.75 | $1.24 |
| POWER EQUIPMENT OPERATOR: MECHANIC | $26.78 | $6.32 |
| POWER EQUIPMENT OPERATOR: LOADER | $18.27 | $3.46 |
| POWER EQUIPMENT OPERATOR: CRANE (TOWER) | $23.29 | $6.02 |
| POWER EQUIPMENT OPERATOR: CRANE | $23.15 | $0.00 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER | $11.40 | $0.00 |
| POWER EQUIPMENT OPERATOR: (BACKHOE) | $17.61 | $2.57 |
| LABORERS: LANDSCAPE | $10.00 | $0.00 |
| LABORERS: COMMON OR GENERAL | $9.82 | $0.00 |
| LABORERS (PIPELAYER) | $11.65 | $1.53 |
| LABORERS (FLAGGER) | $7.39 | $0.20 |
| IRONWORKER, STRUCTURAL | $20.55 | $8.25 |
| IRONWORKER, REINFORCING | $22.45 | $11.85 |
| ELECTRICIAN | $22.22 | $6.40 |
| CEMENT MASON/CONCRETE FINISHER | $17.00 | $4.61 |
| CARPENTER, INCLUDES FORM WORK | $17.00 | $4.61 |