Davis-Bacon
VA20260159 (Rev 2)
Coverage: Virginia • Newport News*.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| EMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY | $40.77 | $20.17 |
| BOILERMAKER | $38.97 | $27.39 |
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING AND ALARM INSTALLATION) | $34.03 | $17.03 |
| MEN OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED | $52.06 | $38.44 |
| POWER EQUIPMENT OPERATOR (CRANES UNDER 90 TONS) | $39.99 | $18.05 |
| POWER EQUIPMENT OPERATOR (CRANES 90 TONS & OVER CAPACITY; TOWER & CLIMBING CRANES WITH CONTROLS 100 FT. ABOVE GROUND) | $40.99 | $18.05 |
| IRONWORKER, RIGGER | $30.22 | $17.56 |
| IRONWORKER: STRUCTURAL AND ORNAMENTAL | $31.00 | $18.28 |
| PLUMBER | $36.92 | $18.25 |
| PIPEFITTER (INCLUDES HVAC PIPE, UNIT AND TEMPERATURE CONTROLS INSTALLATIONS) | $36.92 | $18.25 |
| TRUCK DRIVER: DUMP TRUCK | $15.50 | $0.75 |
| TILE SETTER | $27.80 | $10.25 |
| TILE FINISHER | $23.40 | $0.00 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $18.91 | $4.67 |
| ROOFER | $18.40 | $2.31 |
| PAINTER: SPRAY | $18.10 | $5.43 |
| PAINTER (BRUSH AND ROLLER) | $14.28 | $0.00 |
| OPERATOR: ROLLER | $16.25 | $4.88 |
| OPERATOR: LOADER | $21.28 | $3.17 |
| OPERATOR: FORKLIFT | $19.40 | $7.00 |
| OPERATOR: BULLDOZER | $18.07 | $3.50 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $18.95 | $4.03 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.75 | $3.40 |
| LABORER: COMMON OR GENERAL, INCLUDING DEMOLITION | $12.00 | $1.61 |
| LABORER: PIPELAYER | $12.40 | $1.96 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $12.96 | $3.12 |
| LABORER: MASON TENDER - BRICK | $13.48 | $3.27 |
| IRONWORKER, REINFORCING | $27.18 | $4.13 |
| GLAZIER | $19.36 | $4.68 |
| CEMENT MASON/CONCRETE FINISHER | $17.23 | $0.72 |
| CAULKER | $18.49 | $1.33 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK | $20.26 | $2.77 |