Skip to content
Davis-Bacon

VA20260159 (Rev 2)

Coverage: Virginia • Newport News*.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
EMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY$40.77$20.17
BOILERMAKER$38.97$27.39
ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING AND ALARM INSTALLATION)$34.03$17.03
MEN OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED$52.06$38.44
POWER EQUIPMENT OPERATOR (CRANES UNDER 90 TONS)$39.99$18.05
POWER EQUIPMENT OPERATOR (CRANES 90 TONS & OVER CAPACITY; TOWER & CLIMBING CRANES WITH CONTROLS 100 FT. ABOVE GROUND)$40.99$18.05
IRONWORKER, RIGGER$30.22$17.56
IRONWORKER: STRUCTURAL AND ORNAMENTAL$31.00$18.28
PLUMBER$36.92$18.25
PIPEFITTER (INCLUDES HVAC PIPE, UNIT AND TEMPERATURE CONTROLS INSTALLATIONS)$36.92$18.25
TRUCK DRIVER: DUMP TRUCK$15.50$0.75
TILE SETTER$27.80$10.25
TILE FINISHER$23.40$0.00
SPRINKLER FITTER (FIRE SPRINKLERS)$18.91$4.67
ROOFER$18.40$2.31
PAINTER: SPRAY$18.10$5.43
PAINTER (BRUSH AND ROLLER)$14.28$0.00
OPERATOR: ROLLER$16.25$4.88
OPERATOR: LOADER$21.28$3.17
OPERATOR: FORKLIFT$19.40$7.00
OPERATOR: BULLDOZER$18.07$3.50
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$18.95$4.03
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$17.75$3.40
LABORER: COMMON OR GENERAL, INCLUDING DEMOLITION$12.00$1.61
LABORER: PIPELAYER$12.40$1.96
LABORER: MASON TENDER - CEMENT/CONCRETE$12.96$3.12
LABORER: MASON TENDER - BRICK$13.48$3.27
IRONWORKER, REINFORCING$27.18$4.13
GLAZIER$19.36$4.68
CEMENT MASON/CONCRETE FINISHER$17.23$0.72
CAULKER$18.49$1.33
CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK$20.26$2.77

Related Wage Determinations

View directory →