Skip to content
Davis-Bacon

VA20260185 (Rev 1)

Coverage: Virginia • Manassas Park*, Manassas*, Prince William.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION$36.85$14.13
CEMENT MASON/CONCRETE FINISHER$20.70$8.03
TRUCK DRIVER: SINGLE & MULTI AXLE$19.22$3.15
TRUCK DRIVER: HEAVY OVER 7 CY$18.05$0.00
TRUCK DRIVER: FUEL AND LUBRICANT SERVICE$18.25$0.00
TRUCK DRIVER : HEAVY 7CY & UNDER$15.53$0.00
TRAFFIC CONTROL: FLAGGER$14.86$0.21
PAVEMENT MARKING TRUCK DRIVER$18.78$0.00
PAVEMENT MARKING OPERATOR$22.15$0.00
OPERATOR: BULLDOZER, INCLUDING UTILITY$20.64$0.00
OPERATOR: ASPHALT SPREADER AND DISTRIBUTOR$19.27$2.51
OPERATOR: SCREED$22.13$4.89
OPERATOR: ROLLER (FINISHING)$18.40$3.87
OPERATOR: ROLLER$18.92$0.00
OPERATOR: PILEDRIVER$21.83$4.08
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$20.90$1.56
OPERATOR: PAVEMENT PLANER GROUNDSMEN$19.75$0.00
OPERATOR: PAVEMENT PLANER$20.10$1.24
OPERATOR: MILLING MACHINE$23.19$2.94
OPERATOR: MECHANIC$22.84$0.00
OPERATOR: LOADER$18.35$2.90
OPERATOR: HYDROSEEDER$16.64$0.00
OPERATOR: GRADER/BLADE$23.21$0.00
OPERATOR: GRADALL$19.26$0.00
OPERATOR: DRILL$24.89$0.00
OPERATOR: CRANE$29.46$0.00
OPERATOR: BROOM/SWEEPER$17.40$2.01
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$19.00$3.49
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$23.93$0.00
LABORER: POWER TOOL OPERATOR$15.69$0.00
LABORER: PIPELAYER$20.48$0.00
LABORER: GRADE CHECKER$14.88$0.00
LABORER: COMMON OR GENERAL$15.77$0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR$19.05$1.75
IRONWORKER, STRUCTURAL$34.18$0.00
IRONWORKER, REINFORCING$34.18$0.00
FENCE ERECTOR$15.28$0.00
CARPENTER, INCLUDES FORM WORK$20.97$0.00

Related Wage Determinations

View directory →