Skip to content
Davis-Bacon

WA20260062 (Rev 2)

Coverage: Washington • Ferry, Garfield.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
ELECTRICIAN (FERRY COUNTY)$49.55$19.09
LINE CONSTRUCTION: LINEMEN$60.54$24.88
ELECTRICIAN$60.00$27.78
POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS AND OVER, AND ALL CLIMBING, OVERHEAD,RAIL AND TOWER); LOADERS (OVERHEAD AND FRONT-END, 10 YARDS AND OVER) (FERRY COUNTY)$45.36$23.40
ROUP 7 BACKHOE (OVER 110,000); TRACKHOE/EXCAVATOR (3 YDS & OVER); CRANES (OVER 45 TONS TO BUT NOT INCLUDING 85 TONS); LOADERS (OVERHEAD & FRONT-END, OVER 8 YDS. TO 10 YDS.); GRADER/BLADE (FERRY COUNTY)$43.39$23.40
RACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); CRANES (OVER 25 TONS, TO AND INCLUDING 45 TONS), BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR (FRONT-END & OVERHEAD, 4 YDS. INCL. 8 YDS.); MECHANIC (FERRY COUNTY)$43.05$23.40
GW); TRACKHOE/EXCAVATOR (UNDER 3/4 YD.); CRANES (25 TONS & UNDER); DRILLING EQUIPMENT (8 UNCH BIT AND OVER) (ROBBINS, REVERSE CIRCULATION AND SIMILAR); BOOM TRUCK (UNDER 25 TONS) (FERRY COUNTY)$42.71$23.40
POWER EQUIPMENT OPERATOR: GROUP 4 LOADERS (OVERHEAD & FRONT-END, UNDER 4 YDS. R/T); OILER; DRILL (CHURN, CORE, CALYX OR DIAMOND) (FERRY COUNTY)$42.51$23.40
POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6 OR EQUIVALENT) (FERRY COUNTY)$42.31$23.40
POWER EQUIPMENT OPERATOR: GROUP 2 FORK LIFT (FERRY COUNTY)$41.56$23.40
POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS, ALL TYPES ON SUBGRADE, INCLUDING SEAL AND CHIP COATINGS (FERRY COUNTY)$41.17$23.40
POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS AND OVER, AND ALL CLIMBING, OVERHEAD,RAIL AND TOWER); LOADERS (OVERHEAD AND FRONT-END, 10 YARDS AND OVER) (GARFIELD COUNTY)$42.36$23.40
P 7 BACKHOE (OVER 110,000); TRACKHOE/EXCAVATOR (3 YDS & OVER); CRANES (OVER 45 TONS TO BUT NOT INCLUDING 85 TONS); LOADERS (OVERHEAD & FRONT-END, OVER 8 YDS. TO 10 YDS.); GRADER/BLADE (GARFIELD COUNTY)$40.39$23.40
KHOE/EXCAVATOR (3/4 YD. TO 3 YD.); CRANES (OVER 25 TONS, TO AND INCLUDING 45 TONS), BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR (FRONT-END & OVERHEAD, 4 YDS. INCL. 8 YDS.); MECHANIC (GARFIELD COUNTY)$40.05$23.40
GW); TRACKHOE/EXCAVATOR (UNDER 3/4 YD.); CRANES (25 TONS & UNDER); DRILLING EQUIPMENT (8 UNCH BIT AND OVER) (ROBBINS, REVERSE CIRCULATION AND SIMILAR); BOOM TRUCK (UNDER 25 TONS) (GARFIELD COUNTY)$39.71$23.40
POWER EQUIPMENT OPERATOR: GROUP 4 LOADERS (OVERHEAD & FRONT-END, UNDER 4 YDS. R/T); OILER; DRILL (CHURN, CORE, CALYX OR DIAMOND) (GARFIELD COUNTY)$39.51$23.40
POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6 OR EQUIVALENT) (GARFIELD COUNTY)$39.31$23.40
POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS, ALL TYPES ON SUBGRADE, INCLUDING SEAL AND CHIP COATINGS (GARFIELD COUNTY)$38.17$23.40
POWER EQUIPMENT OPERATOR: GARFIELD COUNTY$38.56$23.40
IRONWORKER (REINFORCING AND STRUCTURAL)$43.40$32.77
LABORER, MASON TENDER BRICK$38.05$16.75
LABORER: A-1: GROUP 10 GRADE CHECKER (GARFIELD COUNTY)$40.21$16.90
LABORER: A-1: GROUP 3 CEMENT/CONCRETE; PIPELAYER; CHIPPING GUNS (GARFIELD COUNTY)$37.46$16.90
LABORER: A-1: GROUP 2 COMMON OR GENERAL LABORER (GARFIELD COUNTY)$37.13$16.90
LABORER: A-1: GROUP 1 FLAGGER (GARFIELD COUNTY)$34.03$16.90
LABORER: A-2: GROUP 10 GRADE CHECKER (FERRY COUNTY)$43.21$16.90
LABORER: A-2: GROUP 3 CEMENT/CONCRETE; PIPELAYER; CHIPPING GUNS (FERRY COUNTY)$40.46$16.90
LABORER: A-2: GROUP 2 COMMON OR GENERAL LABORER (FERRY COUNTY)$40.13$16.90
LABORER: A-2: GROUP 1 FLAGGER (FERRY COUNTY)$37.03$16.90
PAINTER (BRUSH, ROLLER, AND SPRAY.)$36.26$17.01
TRUCK DRIVER: 10 YARD TRUCK$24.61$8.34
TRUCK DRIVER: WATER TRUCK$24.36$8.30
TRUCK DRIVER: DUMP TRUCK$19.67$0.00
LABORER: LANDSCAPE$14.67$0.00
CEMENT MASON/CONCRETE FINISHER$17.21$0.00
CARPENTER$24.03$6.50

Related Wage Determinations

View directory →