Davis-Bacon
WA20260112 (Rev 1)
Coverage: Washington • Skagit.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | $75.37 | $18.82 |
| TILE SETTER | $49.70 | $18.62 |
| TILE FINISHER | $40.98 | $18.17 |
| BRICKLAYER | $55.34 | $20.05 |
| CARPENTER | $63.98 | $19.13 |
| ELECTRICIAN | $55.01 | $29.20 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $61.47 | $27.57 |
| OPERATOR: GRADER/BLADE | $61.47 | $27.57 |
| OPERATOR: BULLDOZER (D9 & UNDER) | $60.02 | $27.57 |
| OPERATOR: BLADE FINISH | $60.69 | $27.57 |
| OPERATOR: LOADER (OVERHEAD UNDER 6 YARDS) | $60.69 | $27.57 |
| OPERATOR: LOADER (OVERHEAD 6 YARDS BUT NOT INCLUDING 8 YARDS) | $61.47 | $27.57 |
| OPERATOR: CRANE (45 TONS THROUGH 99 TONS, UNDER 150' OF BOOM (INCLUDING JIB WITH ATTACHMENTS)) | $61.47 | $27.57 |
| OF BOOM INCLUDING JIB WITH ATTACHMENTS.) | $63.29 | $27.57 |
| OPERATOR: CRANE (20 TONS THROUGH 44 TONS WITH ATTACHMENTS; TRUCK CRANE OILER/DRIVER: 100 TONS) | $60.69 | $27.57 |
| OPERATOR: CRANE (100 TONS THROUGH 199 TONS, OR 150' OF BOOM (INCLUDING JIB WITH ATTACHMENTS)) | $62.39 | $27.57 |
| IRONWORKER | $57.94 | $34.52 |
| LABORER: COMMON OR GENERAL | $50.38 | $16.96 |
| LABORER: FORM STRIPPING | $50.38 | $16.96 |
| LABORER: JACKHAMMER | $51.52 | $16.99 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $50.38 | $16.96 |
| LABORER: NOZZLE PERSON | $52.31 | $17.01 |
| LABORER, MASON TENDER BRICK | $50.38 | $16.96 |
| LABORER: CONCRETE SAW CHAIN | $51.52 | $16.99 |
| LABORER: FIRE WATCH | $40.56 | $15.60 |
| PAINTER | $41.24 | $14.70 |
| CEMENT MASON/CONCRETE FINISHER | $54.16 | $21.27 |
| PIPEFITTER | $60.72 | $34.15 |
| PLUMBER | $60.72 | $34.15 |
| SPRINKLER FITTER | $68.89 | $33.80 |
| SHEET METAL WORKER | $66.05 | $29.41 |
| TRUCK DRIVER: DUMP TRUCK | $31.81 | $16.53 |
| ROOFER | $27.00 | $0.00 |
| OPERATOR: ROLLER | $55.10 | $3.71 |
| OPERATOR: OILER | $36.39 | $16.62 |
| OPERATOR: MECHANIC | $40.77 | $15.91 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $40.53 | $9.56 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $53.76 | $0.00 |
| LABORER: GRADE CHECKER | $31.86 | $12.98 |
| LABORER: PIPELAYER | $32.17 | $11.49 |
| LABORER: HOD CARRIER | $33.50 | $11.08 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $41.20 | $3.03 |
| LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, & CEILINGS) | $38.85 | $10.70 |
| TRUCK DRIVER: CONCRETE TRUCK | $55.43 | $27.52 |
| OPERATOR: CONCRETE PUMP | $52.92 | $22.63 |
| OPERATOR: DRILL | $56.42 | $21.15 |
Related Wage Determinations
View directory →Davis-Bacon
WA20260027 (Rev 1)
Washington • Grays Harbor
Davis-Bacon
WA20260038 (Rev 1)
Washington • San Juan
Davis-Bacon
WA20260040 (Rev 1)
Washington • Wahkiakum
Davis-Bacon
WA20260045 (Rev 2)
Washington • Grant
Davis-Bacon
WA20260046 (Rev 1)
Washington • Grays Harbor
Davis-Bacon
WA20260049 (Rev 1)
Washington • Kittitas