Davis-Bacon
WA20260116 (Rev 1)
Coverage: Washington • Thurston.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | $75.37 | $18.82 |
| TILE SETTER | $49.70 | $18.62 |
| TILE FINISHER | $40.98 | $18.17 |
| BRICKLAYER | $55.34 | $20.05 |
| CARPENTER (INCLUDES DRYWALL HANGER) | $63.98 | $19.13 |
| ELECTRICIAN | $65.14 | $26.56 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (UNDER 15 METRIC TONS) | $59.46 | $27.32 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (OVER 30 METRIC TONS AND UP TO 50 METRIC TONS) | $60.91 | $27.32 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (15 TO 30 METRIC TONS) | $60.14 | $27.32 |
| OPERATOR: CONCRETE PUMP (TRUCK MOUNT WITH BOOM ATTACHMENT OVER 42M) | $60.14 | $27.32 |
| POWER EQUIPMENT OPERATOR: DOZER (D-9 & UNDER) | $59.46 | $27.32 |
| OPERATOR: ROLLER (PLANT MIX OR MULTI-LIFT MATERIALS) | $59.46 | $27.32 |
| OPERATOR: ROLLER (OTHER THAN PLANT MIX) | $55.68 | $27.32 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $60.91 | $27.32 |
| OPERATOR: OILER (TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER) | $59.46 | $27.32 |
| OPERATOR: OILER (DRILL OILERS: AUGER TYPE; TRUCK OR CRANE MOUNT; TRUCK CRANE OILER/DRIVER: UNDER 100 TONS) | $60.14 | $27.32 |
| OPERATOR: LOADER (OVERHEAD UNDER 6 YARDS) | $60.14 | $27.32 |
| OPERATOR: LOADER (OVERHEAD 6 YARDS BUT NOT IINCLUDING 8 YARD) | $60.91 | $27.32 |
| OPERATOR: GRADER/BLADE | $60.91 | $27.32 |
| OPERATOR: CRANE (45 TONS THROUGH 99 TONS, UNDER 150' OF BOOM (INCLUDING JIB WITH ATTACHMENTS)) | $60.91 | $27.32 |
| OPERATOR: CRANE (20 THROUGH 44 TONS WITH ATTACHMENTS; TRUCK CRANE OILER/DRIVER: 100 TONS) | $60.14 | $27.32 |
| OPERATOR: CRANE (100 THROUGH 199 TONS, OR 150' OF BOOM (INCLUDING JIB WITH ATTACHMENTS)) | $61.81 | $27.32 |
| OPERATOR: BLADE FINISH | $60.91 | $27.32 |
| IRONWORKER | $57.94 | $34.52 |
| LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, & CEILINGS) | $50.38 | $16.96 |
| LABORER: FORM STRIPPING | $50.38 | $16.96 |
| LABORER: GRADE CHECKER | $52.31 | $17.01 |
| LABORER: JACKHAMMER | $51.52 | $16.99 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $50.38 | $16.96 |
| LABORER: NOZZLE PERSON | $52.31 | $17.01 |
| LABORER: CONCRETE SAW CHAIN | $51.52 | $16.99 |
| LABORER: HOD CARRIER | $53.99 | $17.05 |
| LABORER, MASON TENDER BRICK | $50.38 | $16.96 |
| LABORER: FIRE WATCH | $40.56 | $15.60 |
| PAINTER | $41.24 | $14.70 |
| DRYWALL FINISHER/TAPER | $53.59 | $23.65 |
| CEMENT MASON/CONCRETE FINISHER | $54.16 | $21.27 |
| PLASTERER | $52.50 | $20.67 |
| PIPEFITTER | $60.72 | $34.15 |
| PLUMBER | $60.72 | $34.15 |
| ROOFER | $48.01 | $16.44 |
| SPRINKLER FITTER | $68.89 | $33.80 |
| SHEET METAL WORKER | $69.86 | $33.39 |
| TRUCK DRIVER: DUMP TRUCK | $46.71 | $8.58 |
| OPERATOR: MECHANIC | $45.17 | $19.20 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $40.53 | $9.56 |
| LABORER: PIPELAYER | $35.83 | $10.89 |
| LABORER: COMMON OR GENERAL | $38.17 | $6.88 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $42.25 | $0.00 |
| TRUCK DRIVER: CONCRETE TRUCK | $55.43 | $27.52 |
| OPERATOR: DRILL | $56.42 | $21.15 |
Related Wage Determinations
View directory →Davis-Bacon
WA20260027 (Rev 1)
Washington • Grays Harbor
Davis-Bacon
WA20260038 (Rev 1)
Washington • San Juan
Davis-Bacon
WA20260040 (Rev 1)
Washington • Wahkiakum
Davis-Bacon
WA20260045 (Rev 2)
Washington • Grant
Davis-Bacon
WA20260046 (Rev 1)
Washington • Grays Harbor
Davis-Bacon
WA20260049 (Rev 1)
Washington • Kittitas