Davis-Bacon
WA20260133 (Rev 2)
Coverage: Washington • Walla Walla.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| CARPENTER | $44.21 | $17.28 |
| LINE CONSTRUCTION: LINE PERSON | $64.17 | $24.54 |
| TREE TRIMMER: GROUND PERSON | $22.60 | $16.37 |
| TREE TRIMMER | $42.57 | $17.97 |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR | $55.19 | $20.94 |
| LINE CONSTRUCTION: (GROUND PERSON) | $37.53 | $17.74 |
| ELECTRICIAN | $60.00 | $27.78 |
| Truck or Crane Mount; Loader-Overhead Under 4 Yards Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yar | $40.39 | $23.40 |
| Truck or Crane Mount; Loader-Overhead Under 4 Yards Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yar | $40.05 | $23.40 |
| Truck or Crane Mount; Loader-Overhead Under 4 Yards Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yar | $39.71 | $23.40 |
| Truck or Crane Mount; Loader-Overhead Under 4 Yards Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yar | $39.51 | $23.40 |
| Truck or Crane Mount; Loader-Overhead Under 4 Yards Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yar | $39.31 | $23.40 |
| Truck or Crane Mount; Loader-Overhead Under 4 Yards Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yar | $38.56 | $23.40 |
| Truck or Crane Mount; Loader-Overhead Under 4 Yards Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yar | $38.17 | $23.40 |
| IRONWORKER | $43.40 | $32.77 |
| TRAFFIC CONTROL: FLAGGER | $34.03 | $16.90 |
| LABORER: NOZZLE PERSON | $52.31 | $17.01 |
| LABORER: PIPELAYER | $37.80 | $16.90 |
| PAINTER | $41.24 | $14.70 |
| CEMENT MASON/CONCRETE FINISHER | $40.89 | $18.64 |
| TRUCK DRIVER: WATER TRUCK | $31.62 | $16.84 |
| TRUCK DRIVER: DUMP TRUCK | $27.94 | $17.30 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $30.61 | $10.89 |
| OPERATOR: FORKLIFT | $45.93 | $19.20 |
| OPERATOR: BULLDOZER | $28.14 | $15.76 |
| LABORER: FENCE ERECTOR | $30.21 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $27.51 | $2.96 |
| LABORER: HOD CARRIER | $35.06 | $10.94 |
| LABORER: CONCRETE SAW CHAIN | $36.24 | $10.89 |
| LABORER: COMMON OR GENERAL | $37.83 | $0.00 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $36.96 | $8.56 |
| GRADE CHECKER | $31.40 | $14.10 |
| TRUCK DRIVER: ASPHALT MIX | $55.43 | $27.52 |
| OPERATOR: CRANE | $54.41 | $25.11 |
Related Wage Determinations
View directory →Davis-Bacon
WA20260027 (Rev 1)
Washington • Grays Harbor
Davis-Bacon
WA20260038 (Rev 1)
Washington • San Juan
Davis-Bacon
WA20260040 (Rev 1)
Washington • Wahkiakum
Davis-Bacon
WA20260045 (Rev 2)
Washington • Grant
Davis-Bacon
WA20260046 (Rev 1)
Washington • Grays Harbor
Davis-Bacon
WA20260049 (Rev 1)
Washington • Kittitas