| Occupation | Base | Fringe |
|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $38.05 | $30.87 |
| BOILERMAKER | $47.13 | $28.93 |
| BRICK POINTER/CAULKER/CLEANER | $31.65 | $25.56 |
| MASON - STONE | $33.00 | $26.18 |
| CARPENTER (INCLUDING DRYWALL HANGING, FORM WORK, SCAFFOLD BUILDER AND FLOOR LAYING - CARPET, HARDWOOD, RESILIENT AND VINYL) | $33.84 | $25.51 |
| MILLWRIGHT | $37.40 | $26.06 |
| ELECTRICIAN | $42.73 | $23.71 |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, ROLLER, OILER | $34.71 | $22.05 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE, ALL OTHER CRANES | $45.21 | $22.05 |
| POWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER | $46.21 | $22.05 |
| TOR: GROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAPACITY OF 100 TONS OR MORE AND HOISTS WITH 30,000 POUND LINE PULL OR MORE | $46.56 | $22.05 |
| IRONWORKER: ORNAMENTAL | $35.19 | $25.66 |
| IRONWORKER: STRUCTURAL | $36.10 | $24.65 |
| IRONWORKER: REINFORCING | $36.10 | $24.65 |
| LABORER (WACKER ROLLER OPERATOR) | $28.02 | $16.80 |
| LABORER: GROUP 1 CARPENTER TENDER, COMMON OR GENERAL, DEMOLITION | $22.76 | $16.75 |
| LABORER: ASPHALT RAKER, JACK HAMMER, MOTORIZED BUGGY OPERATOR, WATER BOY | $25.41 | $16.75 |
| PLASTERER | $24.13 | $16.05 |
| PAINTER (DRYWALL FINISHING/TAPING; BRUSH, ROLLER AND SPRAY) | $30.85 | $17.80 |
| GLAZIER | $32.89 | $13.38 |
| LABORER GROUP 2 (Concrete Saw (Hand Held/Walk Behind), Grouting) | $31.97 | $25.36 |
| LABORER GROUP 2 (Airtool Operator, Asbestos Abatement (Removal from Floors, Walls, and Ceiling), Bobcat Operator (Clean up/Demolition), Dewatering, Rodman, Skytrak Forklift Operator) | $34.77 | $26.66 |
| CEMENT MASON/CONCRETE FINISHER | $34.77 | $26.66 |
| CEMENT MASON/CONCRETE FINISHER | $32.52 | $22.34 |
| PLUMBER | $41.00 | $37.63 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | $32.07 | $27.52 |
| TRUCK DRIVER: SINGLE AND DOUBLE AXLE DUMP TRUCKS | $28.52 | $3.00 |
| ROOFER | $24.28 | $9.32 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $27.64 | $18.09 |
| OPERATOR: FORKLIFT | $33.09 | $3.00 |
| OPERATOR: EXCAVATOR | $30.31 | $10.81 |
| OPERATOR: BULLDOZER | $30.24 | $10.26 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $22.05 | $8.54 |
| LABORER: MASON TENDER - BRICK | $21.47 | $8.29 |
| BRICKLAYER | $26.78 | $2.55 |
| LABORER (TAMPER- HAND HELD) | $23.33 | $16.04 |
| LABORER (SCAFFOLD BUILDER) | $23.63 | $16.13 |
| LABORER (PIPELAYER) | $24.06 | $16.31 |
| LABORER (MORTAR MIXING) | $23.35 | $16.07 |
| LABORER (LANDSCAPE) | $22.99 | $16.35 |
| LABORER (GRADE CHECKER) | $22.70 | $16.15 |
| LABORER (CONCRETE WORKER) | $23.57 | $16.19 |
| LABORER (CHIPPING GUNS) | $24.78 | $16.25 |
Related Wage Determinations
View directory →Davis-Bacon
WV20260025 (Rev 1)
West Virginia • Ritchie
Davis-Bacon
WV20260034 (Rev 1)
West Virginia • Berkeley
Davis-Bacon
WV20260110 (Rev 1)
West Virginia • Hampshire, Morgan
Davis-Bacon
WV20260013 (Rev 1)
West Virginia • Lewis
Davis-Bacon
WV20260030 (Rev 1)
West Virginia • Upshur
Davis-Bacon
WV20260035 (Rev 1)
West Virginia • Cabell