Davis-Bacon
WV20260049 (Rev 1)
Coverage: West Virginia • Boone, Clay.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $46.50 | $29.43 |
| BRICKLAYER (BRICKLAYER & BRICK POINTER/CAULKER/CLEANER) | $31.65 | $25.56 |
| CARPENTER (INCLUDING DRYWALL HANGING, FORM WORK, SCAFFOLD BUILDER AND FLOOR LAYING - CARPET, HARDWOOD, RESILIENT AND VINYL) | $33.84 | $25.51 |
| ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING) | $39.00 | $23.45 |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, FARM TYPE TRACTOR, LOADER | $34.71 | $22.05 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE, BULLDOZER, EXCAVATOR, FORKLIFT, NON-FARM TYPE TRACTOR, ALL OTHER CRANES, ALL OTHER MECHANICS | $45.21 | $22.05 |
| POWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER | $46.21 | $22.05 |
| LL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAPACITY OF 100 TONS OR MORE AND HOISTS WITH 30,000 POUND LINE PULL OR MORE, MECHANICS WITH TOOLS WITH 3/4 INCH DRIVE AND BELOW | $46.56 | $22.05 |
| IRONWORKER: ORNAMENTAL | $35.19 | $25.66 |
| IRONWORKER (REINFORCING AND STRUCTURAL) | $36.10 | $24.65 |
| LABORER: GROUP 3 PIPELAYER | $25.62 | $17.25 |
| GRADE CHECKER, JACK HAMMER, MASON TENDER-BRICK, MASON TENDER-CEMENT/CONCRETE, MORTAR MIXER, SCAFFOLD BUILDER (BRICK AND MASONRY), SKYTRAK FORKLIFT OPERATOR, TAMPER (HAND HELD), WACKER ROLLER OPERATOR | $24.78 | $17.25 |
| LABORER: GROUP 1 CARPENTER TENDER, COMMON OR GENERAL, DEMOLITION, LANDSCAPE, WATER BOY | $24.16 | $17.25 |
| PAINTER (DRYWALL FINISHING/TAPING; BRUSH, ROLLER AND SPRAY) | $30.85 | $17.80 |
| GLAZIER | $32.89 | $13.38 |
| PIPEFITTER | $38.04 | $39.72 |
| PLUMBER | $41.00 | $37.63 |
| ROOFER | $29.75 | $16.71 |
| TRUCK DRIVER: GROUP 3 DUMP TRUCK (5 CU. YDS. & OVER), TRACTOR HAUL TRUCK, WATER TANK TRUCK (SEMI) | $29.96 | $22.50 |
| TRUCK DRIVER: GROUP 2 DUMP TRUCK (UP TO 5 CU. YDS.), WATER TANK TRUCK (STRAIGHT) | $29.81 | $22.50 |
| LABORER: POWER TOOL OPERATOR | $23.10 | $16.75 |
Related Wage Determinations
View directory →Davis-Bacon
WV20260025 (Rev 1)
West Virginia • Ritchie
Davis-Bacon
WV20260034 (Rev 1)
West Virginia • Berkeley
Davis-Bacon
WV20260110 (Rev 1)
West Virginia • Hampshire, Morgan
Davis-Bacon
WV20260013 (Rev 1)
West Virginia • Lewis
Davis-Bacon
WV20260030 (Rev 1)
West Virginia • Upshur
Davis-Bacon
WV20260035 (Rev 1)
West Virginia • Cabell